F10 -Boiler-West Side-Preparation for Lean Concrete.
F11 -Boiler-West Side-Formworks Installation in Progress.
F2- Boiler-East Side- Final Inspection Prior Concreting
F4-Boiler-East Side-Pile Inspection Test in Progress
Chimney-Steel Fixing-Bottom Layer Base Foundation in Progress
Condensate Pump Pit-Formworks Installation 2nd Formwork in Progress.
Eversendai- Site Erection Office
Fabric Filter-East Side-Ground Levelling
Fabric Filter-Formworks Installation in Progress
Mill A-Steel Fixing in Progress
Turbine Hall-Formworks and Steel Fixing in Progress
Boiler Ash Pit- Formworks Installation in Progress