Final MCW pipe placed into position
19.06.2014
VIP Visit
VIP Visit
VIP Visit
VIP Visit
VIP Visit
VIP Visit
VIP Visit
VIP Visit
VIP Visit
VIP Visit
VIP Visit
MCWPH
MCWPH
MCWPH
MCWPH
MCWPH
MCWPH
18.06.2014
17.06.2014
Fabric filters rooftop |
Duct between FF and Boiler |
FGD south view |
FGD duct |
Boiler cavity |
Boiler tripper floor |
Boiler tripper floor |
Transfer towers |
BC-06 conveyor |
BC-06 conveyor |
BC-06 conveyor connecting to transfer tower TT-13 |
Fixing conveyor rollers at BC-07 |
Conveyor BC-07 rooftop |
Transfer tower TT-13 |
Transfer tower TT-13 inside view |
Bottom ash transfer tower and ash conveyor |
Bottom ash conveyor |
Stacker reclaimer A |
Stacker reclaimer B |
Store and warehouse structural steel |
Service and Fire Water storage tanks |
Demin plant |
Industrial waste water treatment plant |