Final MCW pipe placed into position

 MNG coal crusher house & conveyor BC6

 STH 16m lvl

 STH 16m lvl

  STH 16m lvl

  STH 16m lvl

 F10 Bottom Ash

 Steam blow piping

 GRP phase 3

 Piperack 9

Em. Diesel Generator

19.06.2014

 VIP Visit

  VIP Visit

  VIP Visit

  VIP Visit

  VIP Visit

  VIP Visit

  VIP Visit

  VIP Visit

  VIP Visit

  VIP Visit

 VIP Visit

MCWPH

MCWPH 

 MCWPH

 MCWPH

MCWPH

MCWPH

18.06.2014

STH Level +16.0m

STH Level +16.0m

STH Level +16.0m

STH Level +16.0m

STH Level +16.0m

STH Level +16.0m

STH Level +16.0m

STH Level +16.0m

Piperacks 7 and 15

CEB Control Room

17.06.2014

Fabric filters rooftop

Duct between FF and Boiler

FGD south view

FGD duct

Boiler cavity

Boiler tripper floor

Boiler tripper floor

Transfer towers

BC-06 conveyor

BC-06 conveyor

BC-06 conveyor connecting to transfer tower TT-13

Fixing conveyor rollers at BC-07

Conveyor BC-07 rooftop

Transfer tower TT-13

Transfer tower TT-13 inside view

Bottom ash transfer tower and ash conveyor

Bottom ash conveyor

Stacker reclaimer A

Stacker reclaimer B

Store and warehouse structural steel

Service and Fire Water storage tanks

Demin plant

Industrial waste water treatment plant