26.11.2011

Consortium Office -Alstom -Erection Of Scaffolding For Plastering/Cladding Works.

Proposed Lay Down Area -Alstom -(LBT).

Proposed Alstom Lay Down Area-(LBT) -Surveying Works In Progress.

Hacking Of Piles -Type F3 -Foundation -Boiler -West Side.

Curing To Bunker/Mill Foundation -B15-1st Phase Pour.

Applying Of Curing Compound -Bunker/Mill -Foundation-B13-1st Phase Pour.

Compaction Works -Preparation For FDT/Lean Concrete -Bunker/Mill -Foundation -B3.

Compaction Works -Preparation For FDT/Lean Concrete-Bunker/Mill Foundation -B3.

Installation Of Steel Cage -Pile #A23-800mm dia. -CCB-SinoHydro.

Boring To Pile #A93-800mm dia. -CCB -SinoHydro.

Steel Cages Fabrication -Turbine Hall/CCB -SinoHydro.

25.11.2011

Hacking Of Piles -Type F6 -Foundation -Boiler -West Side.

Curing To Bunker/Mill -Foundation -B13 -1st Phase Pour.

Final Inspection -Bunker/Mill -Foundation -B15 -1st Phase Pour -Prior Concreting.

Concreting To Bunker/Mill -Foundation -B15 -1st Phase Pour.

Concreting To Pile #T170-1000mm dia. -Turbine Hall -SinoHydro.

Boring To Pile #A15-800mm dia. -CCB -SinoHydro.

Lean Concrete Preparation -Bunker/Mill -Foundation -B1/BB.

24.11.2011

Fabric Filter -Excavation In Progress.

Bunker/Mill -Foundation -B15 -Installation Of Formwork.

Bunker/Mill -Foundation -B15 -Installation Of Formwork -1st Phase Pour.

Bunker/Mill -Foundation -B13 -Curing In Progress.

Removing Of Casing -A37-800mm dia. -CCB -SinoHydro.

Type F6 -Foundation -Boiler -West Side -Ready For Lean Concrete.

Hacking Of Piles -Type F3 -Foundation -Boiler -West Side.

Steel Cages -Bore Pile -Turbine Hall/CCB -SinoHydro.

Test Pile -MLT -Chimney -1200mm dia.

Delivery Of Templates -Bunker/Mill -Pedestal.

Delivery Of J-Bolts -Bunker/Mill -Pedestal.

Delivery Of Templates/J-Bolts -Bunker/Mill -Pedestal.

Applying Of Curing Compound -Bunker/Mill -B11 -1st Phase Pour.

Consortium Office -Alstom -Fixing Of Window Frames.

Consortium Office-Alstom -Laying Of Bricks.

Consortium Office -Alstom -Fixing Of Window Frames.

23.11.2011

Aerial View -(View From North).

Existing -Project Site Office -AP/CMC/MudaJaya/GIGA/Econpile/Sinohydro.

Aerial View -MJG4 -(View From West).

Arial View -MJG4. (View From South).

Boring To Test Pile -Chimney -1200mm dia. -EconPile.

Installation Of Sensor Cables -Sonic Logging -Test Pile -Chimney -1200mm dia. -EconPile.

Hacking Of Piles -Type F3 -Foundation -Boiler -West Side.

Applying Of Curing Compound -Bunker/Mill Foundation -B11 -1st Phase Pour.

Final Inspection Prior Concreting -Bunker/Mill -Foundation -B13 -1st Phase Pour.

Installation Of Steel Cage -Test Pile -Chimney -1200mm dia. -EconPile.

Concreting To Bunker/Mill -Foundation -B13 -1st Phase Pour.

Concreting To Bunker/Mill Foundation -B13 -1st Phase Pour.


Installation Of Sonic Logging Pipes -Test Pile Chimney -1200mm dai. -EconPile.

Consortium Site Office -Alstom.

22.11.11

Consortium Office -Alstom.

Fabric Filter Area.

Fabric Filter Area.

Inspection Of Re-Bars -Bunker/Mill -Foundation -B13.

Hacking Of Piles -Type F3 -Foundation -Boiler -West Side.

Chimney Test Pile-1200mm dia. -Preparation To Commence With Boring Works.-EconPile-

Consortium Office-Alstom -Plastering In Progress.

Excavation To Cut-Off Level -Fabric Filter Area.

Steel Fixing -Bunker/Mill -Foundation -B15 -1st Phase Pour.

Installation Of Formwork -Bunker/Mill Foundation -B13 -1st Phase Pour.

Compaction -Backfilling Works -Bunker/Mill Foundation -B1/B3/B5/B7 -Upto Level -1.000