09.12.2011

Fabric Filter -Preparation For Lean Concreting.

Fabric Filter -Preparation For Lean Concrete & Dewatering System -South Side.

Type F6 -Foundation -Boiler-West Side -Steel Reinforcement Completed.

Type F6 -Foundation -Boiler -West Side-Final Cleaning Prior Concreting.

Carting Away Of Debris (Hacked Piles) -Bunker/Mill.

Cleaning Of Debris(Hacked Piles) -Bunker/Mill.

Bunker/Mill -B11-B3 -Preparation For Lean Concrete.

Type F3 -Foundation -Boiler -West Side -Steel Reinforcement -Top Layer.

Type F3 -Foundation -Boiler -West Side -Steel Fixing -Top Layer-In Progress.

Fabric Filter -Bund Preparation For Dewatering System -South Side.

Fabric Filter -Bund Preparation For Dewatering System.(South Side).



Bunker/Mill -B11-B3 -Preparation For Lean Concrete.

08.12.2011

Weekly EHS Tool Box Meeting -AP/CMC/MCB/GIGA.

Consortium Office -Alstom.

Consortium Office -Alstom -Rear View.

Consortium Office -Alstom -Installation Of Ceiling Frames /Wiring Works -Grd.Floor.

Consortium Office -Alstom.

Consortium Office -CMC -1st Floor.

Project Site Office -MudaJaya.

FDT -Bunker/Mill -B11-B3.

FDT -Bunker/Mill -B11-B3.

FDT -Bunker/Mill -B11-B3.

FDT -Bunker/Mill -B11-B13.

Inspection Of Pile #A03 -Bunker/Mill -AP/Tepsco/MCB/CMC.

07.12.2011

Consortium Office -Alstom.

Installation Of Formwork -Type F6-Foundation -Boiler -West Side -Scheduled For Concreting On 09.12.2011 @180cu.m.

Steel Fixing -Type F3 -Foundation -Boiler -West Side.

Bunker/Mill -Compaction Works -Preparation For FDT.

Bunker/Mill -Preparation For FDT.

Compaction -Bunker/Mill -Preparation For FDT -B11 -B3.

Hacking Of Piles -Bunker/Mill -B15.

Excavation To Boiler Area -F3/F7 -East Side.

Fabric Filter -West Side -Preparation For Lean Concrete.

Inspection Of Steel Reinforcement -(Bottom Layer) -Type F3 -Foundation -Boiler -West Side.

Inspection Of Steel Reinforcement -(Bottom Layer) -Type F3 -Foundation -Boiler -West Side.

06.12.2011

Hacking Of Piles -Bunker/Mill-B13.

Bunker/Mill -B 11 -B3 -Ready For PIT & FDT Test.

Inspection Of Steel Reinforcement -Type F6 -Foundation -Boiler -West Side.

Inspection Of Steel Reinforcement (Tepsco/AP/CMC/MCB/GIGA) -Type F6 -Foundation.

PIT -Pile Intergrity Test -Bunker/Mill.

PDA Test -Pile # B94 -800mm dia. -Boiler.

PDA Test -Pile #B94-800mm dia. -Boiler.

PDA Test -Pile #B94-800mm dia. -Boiler.

Installation Of Formwork -Type F6 -Foundation -Boiler -West Side.

Backfilling Works -Bunker/Mill -B11-B3.

Installation Of Formwork -Type F6 -Foundation -Boiler -West Side.

Consortium Office -Alstom.

Consortium Office -Alstom.

05.12.2011

Bunker/Mill -Lean Concrete -B17 -B11.

Bunker/Mill -Hacking Of Piles -In Progress.

Bunker/Mill -B11 -B3 -BA -BB -Backfilling Works In Progress.

Bunker/Mill -B11 -B3 -BA -BB -Backfilling & Compaction In Progress.

Concreting To Pile #A46 -800mm dia. -CCB -SinoHydro.

Boring To Pile #A06 -800mm dia. -CCB -SinoHydro.

Steel Reinforcement -Type F6 -Foundation -Boiler -West Side.

Soil Investigation -Additional -Chimney Location.

Steel Fixing -Type F3-Foundation -Boiler -West Side.

Steel Fixing -Type F3 -Foundation -Boiler -West Side.

Fabric Filter -Dewatering In Progress -Preparation For Lean Conc. / Hacking Of Piles.

Consortium Office -Alstom.

Consortium Office -Alstom -Installation Of Gypsum Board -Grd. Floor.

Consortium Office -Alstom.

Consortium Office -Alstom -Installation Of Gypsum Board -Grd. Floor.

Consortium Office -Alstom -Tiling Works -Grd. Floor -Wash Rooms.