Weekly EHS Tool Box Briefing -ALSTOM/CMC/MCB/GIGA/SINOHYDRO/MURRAY ROBERT/ECONPILE.
Boring To Pile # HN41-1200mm dia. -Chimney -BOP -EconPile.
Excavation To Fabric Filter Area.
Fabric Filter -Installation Of Steel Reinforcement -Pile Cap.
Sheet Piling -Coffer Dam -F1 Foundation -Boiler -West Side.
F3 Foundation -Boiler -West Side -Curing In Progress.
Installation Of Formwork -Bunker/Mill -B17 -B13 -BA-BB.
Inspection Of Steel Cages -Slag Conveyor -800mm dia. -SinoHydro.
PIT -Pile #T247 -1000mm dia. -Turbine Hall.
Preparation For MLT -Pile #T282 -1000mm dia. -Turbine Hall -SinoHydro.
BOP -MCWS -Backfilling In Progress.
Tower Crane Parts -To Be Installed & Utilized @ Turbine Hall.
BOP -Coal Yard -North Side -Preparation For MLT.
BOP -Chimney -Installation Of Steel Cage -Pile #HN41-1200mm dia. -EconPile.
Fabric Filter -Installation Of Steel Reinforcement -Pile Caps.
F1 Foundation -Boiler -West Side -Excavation In Progress.