18.04.2014

 STH 16ml lvl

 STH 16ml lvl - steam blow pipe

  STH 16ml lvl ST valves

 STH 16ml lvl - center bearing casing

 STH 16ml lvl 

 STH 16ml lvl 

 STH LBF HP bypass skid

 STH 0ml lvl 

 STH 0ml lvl 

 STH 0ml lvl H11

 Boiler cavity

 Boiler FF CO2 skid

 F10 Bottom Ash Transfer Tower

 FGD seal air system

 FGD Dosing

 Fabric Filter

 CMC ID fans

 Coal Conveyor System

 Piperack 16

 Industrial waste Plant

  Industrial waste Plant

New 5 year Fly-ash pond

Fly-ash Conveyor

15.04.2014

 STH 16m lvl Panoramic

  STH 16m lvl 

  STH 16m lvl 

 STH 16m lvl 

  STH 8m lvl 

 STH 8m lvl 

 STH South

 CEB Control Rm

 CEB Engineering Rm

 STH roof & Boler South side

 Boiler east side

c

 STH 8m lvl 

 Bottom Ash Silo

 Bottom Ash Transfer Tower

 GRP phase 3

 Absorber north side

 CMC FGD Ducting

 Compressor Building

  Compressor Building

 FF/FGD Elec BLD

 Fabric Filer South

 Demin Plant

 Industrial Waste Plant

 Stacker Reclaimer A

  Stacker Reclaimer B

 Coal Conveyor BC06

 Coal Conveyor BC06 & BC07

 Piperack 16

 Coal Conveyor BC05

  Coal Conveyor BC04

 Crusher House