29.06.2013

 MNG 4 south end
STH sound end 
Aeration basin 
 Aeration basin 
 MCW/GRP dog leg before Aeration basin
Fire fighting pumphouse 
 MCWPH
MNG reclamation & MNG 4 Ash disposal area

28.06.2013


BEB Cable pulling 
 CEB Aux Transformer terminated
CEB Marshalling Cabinets 
 CEB Marshalling Cabinets 
 Transformer Compound
 Boiler looking northend
 Boiler cavity
GRP phase 4 looking nouth  
 Absorber/Reactor tower
 MCWPH north end
MCWPH center 
MCWPH south end 
 MCW discharge
Coal handling & BOP Elec buildingf 
Industrial waste water pit

27.06.2013







 De-aerator
 De-aerator
De-aerator 
De-aerator 
 Condenser
 ACW pipe
HP & IP turbines 
Boiler Elec J/Bs 
 Fabric Filter
FGD Duct 
 ID Fan
 GRP Phase 4
 BOP Raw Water & Demin. tanks
 Compressor building
Industrial Waste Pit 
Fly Ash Silo

26.06.2013

 IP Turbine
 IP Turbine
 IP Turbine
IP Turbine 
IP Turbine 
 IP Turbine
 IP Turbine
 IP Turbine
LP 2 Turbine 
 STG Table
 K11 Tank
De-aerator Tank
  K11 Tank
 Boiler cavity looking south
 Boiler Cavity looking north H/L
 Boiler Cavity looking north L/L
 STH 0m lvel polishing plant
Baby Turbine 1 west 
Baby Turbine 2 east  
CEB roof 
Compressor Building