MJG4
29.06.2013
MNG 4 south end
STH sound end
Aeration basin
Aeration basin
MCW/GRP dog leg before Aeration basin
Fire fighting pumphouse
MCWPH
MNG reclamation & MNG 4 Ash disposal area
28.06.2013
BEB Cable pulling
CEB Aux Transformer terminated
CEB Marshalling Cabinets
CEB Marshalling Cabinets
Transformer Compound
Boiler looking northend
Boiler cavity
GRP phase 4 looking nouth
Absorber/Reactor tower
MCWPH north end
MCWPH center
MCWPH south end
MCW discharge
Coal handling & BOP Elec buildingf
Industrial waste water pit
27.06.2013
De-aerator
De-aerator
De-aerator
De-aerator
Condenser
ACW pipe
HP & IP turbines
Boiler Elec J/Bs
Fabric Filter
FGD Duct
ID Fan
GRP Phase 4
BOP Raw Water & Demin. tanks
Compressor building
Industrial Waste Pit
Fly Ash Silo
26.06.2013
IP Turbine
IP Turbine
IP Turbine
IP Turbine
IP Turbine
IP Turbine
IP Turbine
IP Turbine
LP 2 Turbine
STG Table
K11 Tank
De-aerator Tank
K11 Tank
Boiler cavity looking south
Boiler Cavity looking north H/L
Boiler Cavity looking north L/L
STH 0m lvel polishing plant
Baby Turbine 1 west
Baby Turbine 2 east
CEB roof
Compressor Building