Boiler and Steam Turbine Hall - Looking North

Boiler - Installation of Header
Boiler  - Looking West

Boiler  - Looking East
Boiler Area 1

Steam Turbine Hall - Looking West
Steam Turbine Hall - Installation of Grating
Steam Turbine Hall - Annex
Steam Turbine Hall - Looking East
Central Electrical Building - Looking West

Central Electrical Building - Looking East

Central Electrical Building - Gnd Flr
Central Electrical Building - 1st Flr
Central Electrical Building - 2nd Flr
GSU Trafo Foundation - Looking East

Boiler Electrical Building
Fabric Filter Plant - West Side

Fabric Filter Plant - South Side

MCW Pipeline South of Turbine Hall
MCW Pipe Trench North of New HV Line

MCW & GRP Pipes South of New HV Line

MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond

Industrial Waste Water
Bottom Ash Silo Piling
Aeration Basin

Demin Plant & Tanks

U/G Electrical Ducting - West of STG
Screening Plant Foundation

23.01.2013

Boiler and Steam Turbine Hall - Looking North
Boiler  - Looking West
Boiler  - Looking East
Boiler Area - Feeder Floor
Boiler - Installation of Header
Boiler - Installation of Header

Boiler Area 1
Steam Turbine Hall - Looking West

Steam Turbine Hall - Looking East
Steam Turbine Hall - STG Foundation North Side

Steam Turbine Hall - Installation of Grating
Steam Turbine Hall - Annex
Central Electrical Building - Looking West
Central Electrical Building - Looking East

Central Electrical Building - Gnd Flr
Central Electrical Building - 1st Flr

Central Electrical Building - 2nd Flr
GSU Trafo Foundation - Looking East

Fabric Filter Plant
Boiler Electrical Building
MCW Pipeline South of Turbine Hall
MCW Pipe Trench North of New HV Line
MCW & GRP Pipes South of New HV Line

Industrial Waste Water
Bottom Ash Silo Piling

Aeration Basin
Demin Plant & Tanks
FGD Duct and ID Fans Foundations

FGD Ducts Foundations
U/G Electrical Ducting - West of Fabric Filter

U/G Electrical Ducting - West of STG

Fly Ash Silo Foundation