09.06.2012

 Phase2_SWFGD_GRP-West of Chimney - Looking South
 Phase2_SWFGD_GRP-North of Chimney - Looking East
 Chimney - Looking South
 Boiler Electrical Building - Looking Northeast
 Fabric Filter - Looking East
 Boiler Area - Looking Southeast
 Boiler-Structural Steel-East Side - Looking Southwest
   Boiler-Structural Steel-West Side - Looking Southeast
  Boiler-Structural Steel - Looking Northeast
  Boiler-Structural Steel - Looking Northwest
  Mill A-Mill Side and Bowl Hub onto Foundation, Mill Side for Mill B Prep. - Looking West
   Mill A-Mill Side & Bowl Hub, Mill B-Mill Side onto Foundation respectively - Looking Southwest
  Mill D Foundation - Looking Southeast
Mill C Foundation - Looking Southwest
   Boiler-East Side - Looking South
  Boiler Cavity Area - Looking South
  Boiler-Cavity Area-Concete Gully - Looking West
  Boiler-East Side-Concrete Gully - Looking East
 Ash Hopper - Looking East
  Boiler-North Side-Access for 600T Crane - Looking Southeast
   Steam Turbine Hall - Looking Southwest
  Steam Turbine Hall - Looking Northwest
 Steam Turbine Hall-South Side-Cooling Water Pipe (CWP) Saddle - Looking West
 Steam Turbine Hall-Condenser Sump Pit- Looking West
  Steam Turbine Hall-North Side - Looking East
 Steam Turbine Hall - EHS Posters Awareness
  Central Electrical Building - Looking North
 Pipe Rack-Spun Piling-West Side of  MCW Beneath New HV Line - Looking North
 MCW-Beneath New HV Line - Looking South
Client Tower New HV Line Connecting to Existing Switchyard 

08.06.2012

 Phase2_SWFGD_GRP-North of Chimney - Looking West
Phase2_SWFGD_GRP-West of Chimney - Looking South
  Boiler Electrical Building - Looking Southwest
 Fabric Filter - Looking East
 Boiler Area - Looking Southeast
 Boiler-Structural Steel-East Side - Looking Southwest
  Boiler-Structural Steel-West Side - Looking South 
  Boiler-Structural Steel - Looking Northeast
  Boiler-Structural Steel - Looking Northwest

  Mill E Foundation - Looking West
   Mill D Foundation - Looking Southeast
   Mill C Foundation - Looking Southwest
 Boiler-Mill A-Mill Side Preparation onto Foundation - Looking South 
 Boiler-East Side - Looking North
  Boiler Cavity Area - Looking South
  Boiler-North Side-Access for 600T Crane - Looking East
  Boiler-Cavity Area-Concete Gully - Looking Northwest
Ash Hopper - Looking East
  Steam Turbine Hall-East Side - Looking South
   Steam Turbine Hall - Looking Southwest
  Steam Turbine Hall - Looking Northwest
 Steam Turbine Hall-South Side-Cooling Water Pipe (CWP) Saddle - Looking West

  Steam Turbine Hall - Looking Northeast
  Steam Turbine Hall -South Side-Backfilling Elev. -5.400 - Looking East
  Steam Turbine Hall-North Side - Looking East
 Goal Post Beneath New HV Line - Looking South
Pipe Rack-Spun Piling-West Side of  MCW Beneath New HV Line - Looking North


 MCW-Beneath New HV Line - Looking North
 SWFGD_GRP-Sheet Piling-Bet. New HV Line and Aeration Basin - Looking South
Client Tower New HV Line Connecting to Existing Switchyard