30.03.2013

Power Block Northeast Side

Boiler - North Side

Boiler Backpass Hanger Rods Support Structure

Boiler - Area 2

Boiler - Coal Piping

STH - Roof Installation and Overhead Crane

STH - ST/Gen Table - Looking West

CEB - Cabling Works in progress - 0m level
 
CEB - 10m level
 
CEB Switchgear Room - 10m level

CEB - Auxilliary Transformer (BBT)

Main Transformer Area - Looking East

Main Transformer Area - Looking East

FGD_RGP and MCW Pipes - Looking Southeast

Aeration Basin and CW Discharge Trench - Looking Southeast
 
FGD Aeration basin

FGD Aeration basin

CW Discharge Trench

Fly-ash Silo Foundation

Service/Fire/Potable tank foundation - looking east

Demin Water Plant Foundation

FGD Area - Northside

FGD Area - Southside

FGD Electrical Building

Cooling Water Pumphouse

Manjung 4 BOP Area and Land Reclaimation Works
Manjung 4 Project


29.03.2013

Manjung 4 Power Plant

Power Block Northeast Side

Boiler Backpass Hanger Rods Support Structure

STH West Side

CEB - West Side

CEB - 4m level

CEB Switchgear Room - 10m level

CEB Switchgear Room - 10m level

Fabric Filter Plant East Side

MCW and MCW Saddle south of HV Line (North End)

MCW and MCW Saddle south of HV Line (South End)

MCW Saddle at Aeration Basin

Aeration basin

Aeration basin

CW Discharge Trench

FGD - North Side

Cooling Water Pump-house Northeast Corner

28.03.2013

Power Block Notheast Side

Boiler Backpass Hanger Rods Support Structure

STH - Roofing Works East Side

CEB - 4m level

CEB Battery Room - 10m level

CEB Switchgear Room - 10m level

CEB Switchgear Room - 10m level

 
Main Transformer Area - Looking East
 
Fabric Filter Plant East Side


MCW and MCW Saddle south of HV Line

FGD Aeration basin

FGD Aeration basin

FGD Aeration basin

CW Discharge Trench

Condensate Make up Tank - Looking North

FGD Area Slab - Northside

Screening Plant Foundation

Cooling Water Pump-house Looking North