| Power Block Northeast Side |
| Boiler - North Side |
| Boiler Backpass Hanger Rods Support Structure |
| Boiler - Area 2 |
| Boiler - Coal Piping |
| STH - Roof Installation and Overhead Crane |
| STH - ST/Gen Table - Looking West |
| CEB - Cabling Works in progress - 0m level |
| CEB - 10m level |
| CEB Switchgear Room - 10m level |
| CEB - Auxilliary Transformer (BBT) |
| Main Transformer Area - Looking East |
| Main Transformer Area - Looking East |
| FGD_RGP and MCW Pipes - Looking Southeast |
| Aeration Basin and CW Discharge Trench - Looking Southeast |
| FGD Aeration basin |
| FGD Aeration basin |
| CW Discharge Trench |
| Fly-ash Silo Foundation |
| Service/Fire/Potable tank foundation - looking east |
| Demin Water Plant Foundation |
| FGD Area - Northside |
| FGD Area - Southside |
| FGD Electrical Building |
| Cooling Water Pumphouse |
| Manjung 4 BOP Area and Land Reclaimation Works |
| Manjung 4 Project |