| Boiler, FGD Ducts, Booster Fans and FF - Looking Southeast |
| Boiler - Looking Southwest |
| Boiler Duct Work - East Side |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Boiler Duct Work - East Side |
| Boiler-Pressure Parts Lifting Cables |
| Boiler_Area 2 Slab Concreting Works |
| Steam Turbine Hall - Looking South |
| Steam Turbine Hall - Looking West |
| Steam Turbine Hall - Looking East |
| Main Transformer Fire Walls |
| Central Electrical Building - Looking Northwest |
| Central Electrical Building - 4M Level |
| Central Electrical Building - 4M Level Cable Tray Installation |
| Central Electrical Building - 10M Level Brickworks Installation |
| Main Transformer Area- Looking East |
| Fabric Filter Plant |
| Boiler Electrical Building - Looking South |
| SWFGD GRP Phase 3 and MCW Saddle - Looking Northwest |
| MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
| Reclaimed Existing 5 yr Ash pond |
| Service/Fire water storage tanks fdn works |
| Fly Ash Silo - Looking East |