STH 16.0m level |
STH 16.0m level |
STH Lube Oil room |
STH 16.0m level |
STH 16.0m level |
FGD north view |
Boiler cavity |
H2 Gas Bottles area |
STH Steam Blow preparation |
STH south view |
Bottom Ash Transfer Tower |
Piperacks 15.1 and 15.2 |
Coal Crusher House |
Conveyor structures BC06 and BC07 |
Stacker reclaimer A |
Stacker reclaimer B |
GRP Phase 5.6 |
Store and Warehouse building foundation |