 STH 16m lvl

Boiler feed floor
MNG4 south view

MNG4 south view

Boiler south view

STH and CEB south view

CEB south view

Client coal yard

Client HV switchyard

Client HV Switchyard

Transfer towers

Transfer tower TTS-13 and conveyor BC-07

Coal handling control building

Coal handling electric room

Stacker reclaimer A

Stacker reclaimer B

Piperack 14

Aeration basin

Aeration basin

Coal yard run-off basin

Fuel oil forwarding station

Demin plant

MCWPH and Electrochlorination plant
DCS room block work in DCS room, CWPH
Start of cable tray supports on concrete wall at MCWPH, going to the pumps
CWPH connection piece
 
PR 11 connection to CWPH, erection of bridge started this am (columns will rest on concrete slab, both sides of the staircase)
Installation of DC panels in DC/UPS in ECP building
New parking at CEB done by EHS
Commissioning meeting room in control room, installation on going
Turbine overview, spray insulation on going
Feeder floor in boiler

11.06.2014

STH Level 16.0m
STH Level 16.0m
STH Level 16.0m
STH steam blow in progress
STH steam blow in progress
MNG4 east view
MNG4 east view
Boiler and STH roof
STH south view
Conveyor BC-06
Transfer tower TTS-13
Conveyor BC-06
MNG4 - ALSTOM site office
Stacker reclaimer A
Stacker reclaimer B
Coal handling control building
Coal handling electric room
Coal yard drainage
Bottom ash transfer tower
Piperack 6
Piperack 11
Fuel oil forwarding station
FGD aeration basin
FGD aeration basin electrical building
FGD aeration basin electrical building 1st floor
Cable tray FGD aeration basin electrical building to pump house
FGD aeration basin lining
FGD aeration basin west view
Coal yard run-off basin
MCWPH structural steel
MCWPH
MCWPH
MCWPH
MCWPH
MCWPH drum screens
MCWPH drum screen
MCWPH drum screen
MCWPH
MCWPH intake