STH 16m lvl
Boiler feed floor
| MNG4 south view |
| MNG4 south view |
| Boiler south view |
| STH and CEB south view |
| CEB south view |
| Client coal yard |
| Client HV switchyard |
| Client HV Switchyard |
| Transfer towers |
| Transfer tower TTS-13 and conveyor BC-07 |
| Coal handling control building |
| Coal handling electric room |
| Stacker reclaimer A |
| Stacker reclaimer B |
| Piperack 14 |
| Aeration basin |
| Aeration basin |
| Coal yard run-off basin |
| Fuel oil forwarding station |
| Demin plant |
| MCWPH and Electrochlorination plant |
| DCS room block work in DCS room, CWPH |
| Start of cable tray supports on concrete wall at MCWPH, going to the pumps |
| CWPH connection piece |
| PR 11 connection to CWPH, erection of bridge started this am (columns will rest on concrete slab, both sides of the staircase) |
| Installation of DC panels in DC/UPS in ECP building |
| New parking at CEB done by EHS |
| Commissioning meeting room in control room, installation on going |
| Turbine overview, spray insulation on going |
| Feeder floor in boiler |