30.08.2013

11kV Energisation from TNBD Supply
@12:15pm 30-08-2013 - TNB Meter Phase 1 Voltage
 11kV Energisation from TNBD Supply
@12:15pm 30-08-2013 - TNB Meter Phase 2 Voltage
 11kV Energisation from TNBD Supply
@12:15pm 30-08-2013 - TNB Meter Phase 3 Voltage
11kV Energisation from TNBD Supply
@12:15pm 30-08-2013 - APS Meter panel

Fabric Filter Northend


Boiler HP Pipe

STH Piping

Tripper Deck
 MCWPH Southend

  MCWPH Southend

  MCWPH Northend

  MCWPH cavity 

  MCWPH cavity 
Demin Plant

Raw water and fire fighting

MCW

Fabric Filter

FGD Duct South side

Absorber

BOP Area

29.082.013


View from main entrance looking south 
 Northend close up View of 
 East side view
 VO11 works
 East side view close up 
North west end view
South east end view
 STH East end view
 STH & Transformer compound south end
Aeration basin 
 Aeration basin 
 MCW pipe return running to Aeration basin
 MCW pipe supply running from MCWPH
MCWPH looking south

STH - 2nd Duplex heater
 STH - 16m lvl
 IPB
 STH west wall
Boiler north end 
 Boiler cavity
 Cable ducts between pit 7 & 8
 Boiler lower furnace assembly area
 FGD Southwest end
FGD Southeast end 
 FGD absorber
 FGD Aeration basin
 MCWPH northend
 MCWPH cavity
 MCWPH cavity
MCWPH southend
 Demin Plant
 Firefight supply 
Piperack 2 
 BOP Water treatment Elec building 
 BOP & Coal handling Elec building 
Stacker reclaimer