04.05.2013

Power Block - Looking Southeast

Boiler LBC Piping

Boiler Coal Piping

Boiler Backpass Hanger Rods Support Structure and Boiler Walls

Steam Turbine Hall - Looking West

Steam Turbine Hall - ST Lower Casing

Steam Turbine Hall - Lube Oil Room

Boiler Electrical Building

Boiler Electrical Building - 0m Level

Central Electrical Building - 16m level

Fabric Filter

Fabric Filter and Piling Works for Coal Handling / BOP Electrical Building

Aeration Basin

Demin Water Plant

Service / Fire Water Tank foundations

FGD Ducts - Looking North
 
Bottom Ash Silo

Screening Plant

Chimney Liners

Fly-ash Silo

Land Reclaimation Works

03.05.2013

Boiler Backpass Hanger Rods Support Structure and Boiler Walls

Boiler - Cable tray and Coal Piping Installation

Central Electrical Building - 0m level

Central Electrical Building - 10m level

Central Electrical Building - Battery Room @ 10m level

Central Electrical Building - 16m level

Boiler Electrical Building - 0m level

MCW Piping at Aeration Basin

Aeration Basin

Booster Fan & Ducts - Looking Northwest

Fabric Filter

Bottom Ash Silo

Condensate Make up Tank - Looking North

Chimney Liners

Fly-ash Silo

Cooling Water Pumphouse

Manjung 4 Project

02.05.2013

Boiler Backpass Hanger Rods Support Structure and Boiler Walls

STH  - Looking West

STH - minus 5m Level


Central Electrical Building - 10m level

Central Electrical Building - 16m level

Central Electrical Building - 20m level

Main Transforner Area

Boiler Electrical Building

Aeration Basin

Condensate Make up Tank - Looking North

Booster Fan & Ducts - Looking Northeast

Fly-ash Silo

Fabric Filter and BEB

Cooling Water Pumphouse

Manjung 4 Project