01.12.2012

   Boiler, Fabric Filter & ID Fans - Looking Southeast
 Boiler and Steam Turbine Hall - Looking Northwest
  Boiler-Pressure Parts Hanger
 FGD Duct Foundation bet. ID Fans and Absorber Area - Looking West
 ID Fans - Looking North
Screening House - Looking North

 DeminWater Treatement Plant Area - Looking South
  Main Transformer Area - Looking North
   Main Transformer Area - Looking South
  Steam Turbine Hall Completion of 0.0M lvl Slab -East Side - Looking East
 STH and Central Electrical Building - Looking West
  Steam Turbine Hall - Looking East
 Steam Turbine Hall-ST / GT Table Top  - Looking North
  Steam Turbine Hall Installation of Spring 
  Steam Turbine Hall Installation of Spring
  Central Electrical Building - Looking Southwest
  Phase 3-FGD_GRP and MCW-Excavation Works- Looking Northwest
 MCW Pipe Saddle -to Aeration Basin and CW Pumphouse- Looking South
 Aeration Basin-Spun Piling Works - Looking Southeast
 Reclamation of 5 yr Ash Pond - Looking South

30.11.2012

   Boiler, Fabric Filter & ID Fans - Looking Southeast
 Boiler and Steam Turbine Hall - Looking Northwest
  Boiler - Roof Girder and Pressure Parts Hanger Supports - Installation
  Boiler-Duct  Hanger Supports Preparation
 Boiler-Coal Pipes Installation - Looking West
  Boiler-Pressure Parts Hanger Supports Assembly 
  Fabric Filter - Looking North
 ID Fans - Looking North
  Screening House - Looking North
 Boiler Electrical Building - Looking North
 Fly Ash Silo - Looking North
 Industrial Waste Water Treatment Plant-Spun Piling - Looking Northeast
 Demin Water Treatement Plant - Looking Southeast
  Steam Turbine Hall-East Side - Looking Southeast
  Main Transformer Area - Looking North
 STH and Central Electrical Building - Looking West
  Steam Turbine Hall - Looking East
 Steam Turbine Hall-ST / GT Table - Looking Southwest
 Steam Turbine Hall-ST / GT Table Top- Looking North
STH Overhead Crane Preparation for Erection 
 Aeration Basin-Spun Piling Works - Looking Southeast
 Reclamation of 5 yr Ash Pond - Looking Southeast
 Cooling Water Pump House - Looking South
 Coal Yard West Side - Drainage Works on going - Looking Northwest
 Transfer Tower #10 Area - Looking Northwest
EESB Mech & Elec. Contractor Site Office

29.11.2012

  Boiler, Fabric Filter & ID Fans - Looking Southeast
 Boiler and Steam Turbine Hall - Looking Northwest
  Boiler-Cavity Area - Looking South
  Boiler - Roof Girder Installation
  Absorber Area - Looking Southeat
 FGD Duct Fdn  and Booster Fan & Absorber - Looking Southwest
  Boiler Electrical Building - Looking Northwest
 Fly Ash Silo-Spun Piling Works - Looking North
 Industrial Waste Water Treatment Plant-Spun Piling - Looking Northeast
 STH and Central Electrical Building - Looking West
 Steam Turbine Hall - Looking East
 Steam Turbine Hall-ST / GT Table - Looking Southwest
  Steam Turbine Hall @ 0.0M Lvl -East Side - Looking Northeast
 STH Overhead Crane Prep'n for Installation on going
 Central Electrical Building and Aux. Trafo - Looking Northwest
 Central Electrical Building Grnd flr - Looking South
Phase 3 of  CW Pipe and FGD_GRP Excavation - Looking West
 CW Pipe-Beneath New HV Line - Looking North
  Phase 4_SWFGD_GRP-Beneath New HV Line - Looking North
Reclamation of Existing 5 yr Ash Pond - Looking South