01.08.2014

 
MCWPH intake
Base coal
Base coal
Base coal
Base coal
Base coal
Base coal
MCW intake channel
MCW intake channel
MCWPH view from top
MCW intake channel view from top
FGD north view
FGD south view
FGD duct west view
Duct between FF and Boiler west view
Duct between FF and Boiler east view
Coal handling and BOP electrical building
Fabric Filters roof top
Coal handling and BOP electrical building
Boiler cavity
Boiler FD fans east side
Boiler Fire fighting piping at 25.0m level
Boiler Fire Fighting piping
Boiler tripper floor
Boiler tripper floor
Coal conveyor belt at Boiler tripper floor
Boiler sootblower
Boiler entrance to tripper floor
Boiler
CO2 tank
Bottom ash conveyor structure
Bottom ash silo
Conveyor BC-06 and transfer towers
Transfer tower TTS-13
Stacker reclaimer A
Coal yard P1
Stacker reclaimer B
Store building
Demin plant
Service and fire water tanks
GRP Phase 5.3
Industrial waste water treatment

31-07-14

 MNGIV south view

MNGIV south view

 Boiler coal fire

 Boiler fed belt C



 Steam Blow

Steam Blow

 Steam Blow

 Steam Blow

 Steam Blow

Coal yard Zone 1 & SR A

 Coal yard Zone 1 & SR A

Coal yard Zone 1 & SR A

 Coal yard Zone 1 & SR A

 Coal yard Zone 1 & SR A

 Coal yard Zone 1 & SR A

 Coal yard Zone 1 & SR A

 Power block west view

 Coal Conveyors

 Coal Conveyors

 Coal Conveyors

 Back up Coal supply 

 MCWPH intake

 MCWPH intake

 MCWPH intake

 MCWPH 

 MCWPH 

 MCWPH 

 MCWPH 

 MCWPH 

 MCWPH 

 Electrochlorination BLD

 Electrochlorination BLD

 Electrochlorination BLD

 Electrochlorination BLD

 Electrochlorination BLD

 Electrochlorination BLD

 MCW supply pipe

 MCW discharge

 MCW discharge

 STH 16m lvl

 STH 16m lvl

 STH 16m lvl

 STH 16m lvl

 STH  0m lvl

 STH  0m lvl

 STH  0m lvl

 STH  0m lvl

 STH  0m lvl

 STH  16m lvl

 STH  -5.2m lvl

 F10 Bottom ash

 N2 Storage area

Aeration Basin

 FGD Absorber pumping station

 Fly ash conveyor

 5 yr ash pond

  5 yr ash pond

 Store BLD

 Client HV line