18.08.2012-STH Steel Erection Commence

 Prep'n of Blessing for the Erection of 1st Column Main Steel Structure of  STH -Looking North
 Prep'n of Blessing for the Erection of 1st Column Main Steel Structure of  STH -Looking Southwest
 Prep'n of Blessing for the Erection of 1st Column Main Steel Structure of  STH -Looking Southwest
Blessing for the Erection of 1st Column Main Steel Structure of  STH -Looking Southeast 
Blessing for the Erection of 1st Column Main Steel Structure of  STH Looking Southwest

Blessing for the Erection of 1st Column Main Steel Structure of  STH - Looking Southeast
Finish Blessing for the Erection of 1st Column Main Steel Structure of  STH - Looking Southeast
1st Lift of the Column Main Steel Structure of  STH - Looking West
 Erection of 1st Column Main Steel Structure of  STH
 Erection of 1st Column Main Steel Structure of  STH - Looking Southwest
 Erection of 1st Column Main Steel Structure of  STH - Looking Southwest
 Aerial Pan View_Steam Turbine Hall North Side - Looking South 
 Pan View_Phase2_SWFGD_GRP-North of Chimney - Looking East
Phase2_SWFGD_GRP- Access Pit #1 North of Chimney - Looking Southeast
 Phase2_SWFGD_GRP-West of Chimney - Looking East
 Fabric Filter -West Side- Looking Southeast
 Fabric Filter -Pre Fabrication of Ash Hoppers- Looking Southwest
  Booster Fans - Looking Southeast
 Boiler-West Side - Looking Southeast
  Boiler-West Side- Looking Northeast
  Boiler and Steam Turbine Hall-South Side - Looking North
 Boiler and Fabric Filter - Looking South
 Steam Turbine Hall-East Side - Looking North
 Phase 3_MCW-Excavation Works- Looking Southeast

  Central Electrical Building - Looking Northeast
  Central Electrical Building - Looking Southeast
  Main Transformer Area-Spun Piling Works  - Looking East
 BOP Area-Spun Piling-East Side of STH - Looking Southeast




17.08.2012

  Pan View_Phase2_SWFGD_GRP-North of Chimney - Looking East
Pan View_Phase2_SWFGD_GRP-West of Chimney - Looking North
  Aerial View_Steam Turbine Hall - Looking South
Phase2_SWFGD_GRP-North of Chimney - Looking West
 Phase2_SWFGD_GRP-West of Chimney - Looking East
 Aerial View_Chimney - Looking North
  Aerial View_Boiler Electrical Building - Looking North
 Booster Fans - Looking Southeast
Fabric Filter -West Side- Looking Southeast
Fabric Filter -East Side- Looking Northwest
  Boiler-East Side - Looking Southwest
  Boiler-Cavity Area - Looking South
   Boiler-West Side - Looking Southeast
   Boiler-West Side - Looking Northeast
   Boiler-East Side - Looking Northwest
  Boiler and Steam Turbine Hall-South Side - Looking North
  Boiler and Fabric Filter - Looking South
 Boiler- Coal Pipes and Walkways Installation
 Boiler- Walkways Installation
 Steam Turbine Hall-East Side - Looking South
 Aerial View_Steam Turbine Hall-Prep'n for Main Column Erection - Looking Southwest
 Condensate Make Up Tank - Looking East
  Phase 3_MCW-Excavation Works- Looking Northwest
 Main Transformer Area-Spun Piling Works  - Looking West
 BOP Area-Spun Piling Works-East Side of STH - Looking Southeast
 Central Electrical Building - Looking Northeast
 Central Electrical Building - Looking Southwest