| Manjung 4 southside |
| Manjung 4 northwest side |
| STH southside |
| CEB southside |
| CEB and STH southside |
| Client HV Switchyard |
| Client coal yard |
| Client coal yard |
| Aeration basin |
| Aeration basin |
| Transfer towers |
| Transfer tower |
| Stacker reclaimer 2 |
| Demin plant |
| Manjung 4 viewed from reclaimed land area |
| FGD Duct |
| Fabric Filter |
| Coal handling and BOP electrical building |
| Boiler control building and Piperack 2 |
| Boiler eastside |
| Boiler cavity |
| Boiler lower furnace |
| STH west wall & Condensate make-up tank |
| STH Condenser Modules |
| STH - Power Train |
| Central Electrical Building |
| Bottom Ash Silo |
| Air Compressor Plant |
| MCW pipeline east of power block |
| Cooling water pumphouse |
| Manjung 4 viewed from reclaimed land area |
| Fabric Filter southside and Piperack 1 |
| FGD Duct southside |
| FF/FGD Electrical Building |
| Boiler northside |
| Boiler lower furnace |
| STH Condenser Modules |
| STH - Power Train |
| STH Lube Oil Room |
| Bottom Ash Silo |
| Industrial waste basin |
| Air Compressor Plant |
| Demin Plant |
| Cooling water pump house westside |