09.03.2012

Waste Water Pit -Steel Fixing In Progress -Boiler -East Side.

Mill-F -Steel Fixing To Cantilever Slab.

Mill-E -Final Inspection Prior Concreting.

Turbine Hall -Steel Reinforcement -Raft Foundation.

Turbine Hall -Steel Reinforcement -Raft Foundation.

Site Office -Preparation -EverShendai.

Mill -E -Final Inspection Prior Concreting.

































































08.03.2012

F1-Type A/B/C -Boiler -West Side -Preparation For Lean Concrete / Pile Hacking.

F4-Type A/D -Backfilling & Compaction In Progress.

Mill-F -Adjusting To J-Bolts.

Mill-F -Adjustment To J-Bolts.

Turbine Hall -Steel Reinforcement -Raft Foundation.

Turbine Hall -Steel Reinforcement -Raft Foundation.

07.03.2012

Chimney -Excavation In Progress -Preparation For Lean Concrete & Pile Hacking.

F4-Type A & D -Backfilling In Progress -1st Layer.

Applying Of Curing Compound -Mill Pedestal -B7-BB.

Joint Survey Inspection -Mill Pedestal -B1/B3-BB -J-Bolts -Prior Concreting.

F1-Type A/B/C -Preparation For Lean Concrete & Pile Hacking.

Mill-E -Installation Of J-Bolts & Formwork.

Mill-G.

F4-Type A&D -Boiler -West Side -Backfilling & Compaction In Progress.

Mill-E -Steel Fixing To Cantilever Slab.

Turbine Hall -Condensate Sump Pit -Excavation To Formation Level (-7.2MLSD).

Turbine Hall -Steel Reinforcement -Raft Foundation.

Turbine Hall -Steel Reinforcement -Raft Foundation.

FGD -Pipes -Route -Spun Pile 400mm dia. In Progress -Soil Improvement.

06.03.2012

Chimney -Dewatering In Progress -Preparation For Lean Concrete.

Mill-E -Installation Of Formwork.

Waste Water Pit -Lean Concrete -Preparation For Base Slab.

F1-Type F-Boiler -West Side -Concreting To Stumps.

F1-Type A/B/C -Boiler -West Side -Preparation For Lean Concrete /Pile Hacking.

Turbine Hall -Steel Fixing -Top Layer -Raft Foundation.

Turbine Hall -Steel Fixing -Top Layer -Raft Foundation.

Turbine Hall -Condensate Pit -Excavation In Progress.

Mill-E -Installation Of Formwork.

Mill-E -Adjustment To J-Bolts.

05.03.2012

Mill-E -Installation Of Formwork.

Turbine Hall -Grid 3 -Grid 2 -B-D -Lean Concreting.

Turbine Hall -Re-Bar Inspection -Bottom Layer -B1/B2 -Raft Foundation.

Turbine Hall -Re-Bar Inspection -Bottom Layer-B1/B2 -Raft Foundation.

F1-Type -A/B/C -Preparation For Lean Concrete & Pile Hacking.

Final Inspection -J-Bolts -F1-Type F -Boiler -West Side.

Joint Inspection -J-Bolts -F1-Type F -Boiler -West Side.

02.03.2012

Chimney -BOP -Excavation In Progress.

Waste Water Pit -Boiler -East -Compaction Of Crusher Run.

Mill -E -Preparation For J-Bolts Installation.

F1-Type F -Boiler -West Side -J-Bolts -Stump.

Turbine Hall -Grid 3 -Grid 2 -B-D -Preparation For Lean Concrete.

Turbine Hall -Steel Reinforcement -Raft Foundation -Bottom Layer.

Turbine Hall -Steel Reinforcement -Raft Foundation -Bottom Layer.

Turbine Hall -Steel Reinforcement -Raft Foundation -Bottom Layer.

Mill Equipments -Pulverizer -Delivery.

Mill Equipments -Pulverizer.

GRP -FGD -Pipes -Laydown Area.

Mill-G -Final Inspection Prior Concreting.