| Boiler, FGD Ducts, Booster Fans and FF - Looking South |
| Boiler - Looking Southwest |
| Boiler - Looking Southeast |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Boiler-Pressure Parts Wall |
| Boiler-Coal Piping Installation |
| Boiler - 100m Level East Side |
| Boiler-Pressure Parts Pipe Headers (East Side) |
| Boiler-Pressure Parts Pipe Headers (East Side) |
| Boiler-Pressure Parts Pipe Headers (East Side) |
| Boiler - Looking West |
| Steam Turbine Hall - Looking West |
| Steam Turbine Hall-ST / GT Table (North Side) |
| Steam Turbine Hall-ST / GT Table (South Side) |
| Steam Turbine Hall (South Side) |
| MV Switchgear CEB - 4m level |
| 4 nos. of MV/LV Transformer CEB - 4m level |
| Central Electrical Building cable tray installation- 4m Level |
| Central Electrical Building - 10M level |
| Central Electrical Building - 10m level |
| Central Electrical Building - 16m Level |
| Main Transformer Area- Looking East |
| Main Transformer Area - Installation of 1st GSUT |
| Main Transformer Area - Installation of 1st GSUT |
| Fabric Filter - Looking North |
| Fabric Filter - Looking Northeast |
| Boiler Electrical Building - Looking North |
| FGD Area - Looking South |
| FGD Area - Looking North |
| SWFGD GRP MCW Piping and Saddle Installation |
| MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
| Service/Fire water storage tanks fdn works |
| Demin Water Tank Fdn Works |
| Demin Water Treatment Plant Fdn Works |
| FGD Electrical Building & Pipe Rack 4 Fdns |
| Fly Ash Silo Fdn |
| Reclaimation Works |
| Screening House - Looking Southwest |