08.03.14(Aerial) & 07.03.2014

Power-block & BOP View looking south

 Power-block & BOP View looking north

  Power-block & BOP plan

 Power-block & BOP plan view looking west

  Power-block & BOP plan looking north

 Power-block & BOP plan

  Power-block & BOP looking west

 Coal yard north end

 Coal yard south end

 Coal Yard plan view looking north

 Aeration basin and MCW pipe

  Aeration basin and MCW pipe

MCW pipe run from MCWPH

 MCWPH

                                                                    MCWPH

FGD Absorber north view

Fabric Filters rooftop

STH roof and Annex

West PA Fan foundation

Boiler Tripper Floor

Boiler piping

Boiler roof

GRP Phase 2c

Piperack 4

Piperack 6

Transfer Towers

Conveyor structure to Crusher House

Transfer Tower 13

Stacker Reclaimer A

Stacker Reclaimer B

Bottom ash silo

Industrial Waste Water Treatment

Service and Fire Water Tanks

04.03.2014

MNG4 south view

MNG4 south view

STH and CEB south view

CEB south view

Client HV Switchyard

Client Coal Yard

GRP Phase 6

Aeration Basin

Aeration Basin

Transfer Towers

Conveyor BC1

Transfer Tower 13

Stacker Reclaimer A

Stacker Reclaimer B

Coal Handling Control Building

Coal Handling Electrical room

Coal Yard Run-Off Basin (South)

Piperack 15.2

Piperack 15.2

Fuel Oil Forwarding Station

Electrochlorination Plant

MCWPH