End
of civil works for GRP
14.10.2014
Boiler south view |
STH and CEB south view |
CEB south view |
Client HV Switchyard |
Client HV Switchyard |
Client coal yard |
Transfer towers and coal yards |
Transfer tower 13 and coal conveyor BC-06 |
Stacker reclaimer A |
Stacker reclaimer B |
Piperack 15.2 |
Coal handling control building |
Aeration basin |
Aeration basin |
Coal run-off basin |
Fuel oil forwarding station |
Demin plant |
Electrochlorination plant |
MCWPH and Electrochlorination plant |
CCW discharge channel |
Condensate Polishing Plant acid unloading |
13.10.2014
FGD north view |
ID fans |
Fabric filters roof view |
FD fan west side |
FD fan east side |
Coal handling and BOP electrical building |
Condensate make-up tank |
STH Level 16.0m |
STH Level 16.0m |
STH Lube oil room |
STH annex |
STH roof top |
STH south view |
CEB south view |
CEB 1st floor |
CEB 1st floor |
CEB 2nd floor |
CEB 3rd floor |
CEB control room |
CEB Engineering room |
Boiler east view |
Boiler west view |
Boiler south view |
CO2 tank |
Coal yard I/O station |
Boiler north view |
FD fan east side |
Boiler cavity |
N2/CO2 gas bottles |
Boiler corridor |
Boiler |
Boiler |
STH annex |
Boiler tripper floor rooftop |
Boiler tripper floor |
Boiler tripper floor |
Boiler |
Coal handling & BOP electrical building roof view |
Coal transfer towers |
Coal conveyors BC-06 & BC-07 |
Stacker reclaimer A |
Stacker reclaimer B |
Coal handling control building |
Coal run-off basin |
GRP Phase 5 |
Fly ash silo |
Fly ash silo |
Air compressor station |
Air compressor station |
Bottom ash conveyor |
Sanitary wastewater treatment plant |
Warehouse building east view |
Warehouse building south-west view |
Warehouse building internal view |
Industrial wastewater treatment plant |
Industrial wastewater treatment plant |
Industrial wastewater treatment plant |
Industrial wastewater treatment plant |
Oil water separator |
Storage and Demin tanks |
Service & Fire water storage tanks |
Demin plant |
FGD aeration basin |
FGD aeration basin |
FGD aeration basin |
Aeration basin |
CW discharge channel |
Aeration basin |
Electrochlorination building |
Electrochlorination building ground floor |
Electrochlorination building ground floor |
MCWPH |
MCWPH internal view |
MCWPH drum screens |
MCWPH trash rake |
MCWPH intake |
Plant road preparation |
Plant road preparation |
Subscribe to:
Posts (Atom)