End
of civil works for GRP
14.10.2014
| Boiler south view |
| STH and CEB south view |
| CEB south view |
| Client HV Switchyard |
| Client HV Switchyard |
| Client coal yard |
| Transfer towers and coal yards |
| Transfer tower 13 and coal conveyor BC-06 |
| Stacker reclaimer A |
| Stacker reclaimer B |
| Piperack 15.2 |
| Coal handling control building |
| Aeration basin |
| Aeration basin |
| Coal run-off basin |
| Fuel oil forwarding station |
| Demin plant |
| Electrochlorination plant |
| MCWPH and Electrochlorination plant |
| CCW discharge channel |
| Condensate Polishing Plant acid unloading |
13.10.2014
| FGD north view |
| ID fans |
| Fabric filters roof view |
| FD fan west side |
| FD fan east side |
| Coal handling and BOP electrical building |
| Condensate make-up tank |
| STH Level 16.0m |
| STH Level 16.0m |
| STH Lube oil room |
| STH annex |
| STH roof top |
| STH south view |
| CEB south view |
| CEB 1st floor |
| CEB 1st floor |
| CEB 2nd floor |
| CEB 3rd floor |
| CEB control room |
| CEB Engineering room |
| Boiler east view |
| Boiler west view |
| Boiler south view |
| CO2 tank |
| Coal yard I/O station |
| Boiler north view |
| FD fan east side |
| Boiler cavity |
| N2/CO2 gas bottles |
| Boiler corridor |
| Boiler |
| Boiler |
| STH annex |
| Boiler tripper floor rooftop |
| Boiler tripper floor |
| Boiler tripper floor |
| Boiler |
| Coal handling & BOP electrical building roof view |
| Coal transfer towers |
| Coal conveyors BC-06 & BC-07 |
| Stacker reclaimer A |
| Stacker reclaimer B |
| Coal handling control building |
| Coal run-off basin |
| GRP Phase 5 |
| Fly ash silo |
| Fly ash silo |
| Air compressor station |
| Air compressor station |
| Bottom ash conveyor |
| Sanitary wastewater treatment plant |
| Warehouse building east view |
| Warehouse building south-west view |
| Warehouse building internal view |
| Industrial wastewater treatment plant |
| Industrial wastewater treatment plant |
| Industrial wastewater treatment plant |
| Industrial wastewater treatment plant |
| Oil water separator |
| Storage and Demin tanks |
| Service & Fire water storage tanks |
| Demin plant |
| FGD aeration basin |
| FGD aeration basin |
| FGD aeration basin |
| Aeration basin |
| CW discharge channel |
| Aeration basin |
| Electrochlorination building |
| Electrochlorination building ground floor |
| Electrochlorination building ground floor |
| MCWPH |
| MCWPH internal view |
| MCWPH drum screens |
| MCWPH trash rake |
| MCWPH intake |
| Plant road preparation |
| Plant road preparation |
Subscribe to:
Comments (Atom)
