12.04.2014

Overview from MNG123

 Powerblock southend

 BOP

 Coal Yard

 Stacker reclaimer A

  Stacker reclaimer B

 Coal Yard

 Boiler south end

Aeration Basin

 MCWPH & Electrocholrination

 Fuel Pump Station

 Client Switch Yard

 Piperack 15.2

  Piperack 15.2

  Piperack 15.2


11.04.2014

 Power-block & BOP southeast

 External Polishing Plant

 Demin PlLant

 MCW discharge  - conveyor crossing

Main HV Transformers

 Absorber & FGD ducting

 CMC FGD ducting - Boiler to Fabric Filter

 Aeration basin Fan station

 BOP Water treatment Elec BLD

GRP phase 5

08.04.2014

 STH 16m lvl

  STH 16m lvl

  STH 16m lvl

  STH 16m lvl

 CEB main Control Rm

 CEB Engineering Room

 Boiler Cavity

 Boiler Cavity

 Boiler Cavity

 MCW/GRP & Piperacks

 CMC FGD Ducting from Boiler to Fabric Filter

CMC FGD Ducting from Boiler to Fabric Filter

07.04.2014

Boiler Cavity

 F10 Transfer Tower

 East Side FD/PA fan

 Pipe-rack 6

  Pipe-rack 5

 Steel structure from Boiler to Fabric Filter

 Steel structure from Fabric Filter to FGD

 MCWPH

 MCWPH

 MCWPH

 Electrcholrination BLD

 PIperack 11

Coal yard Control Building

 Coal yard Control Building

 Coal yard Conveyor

 Fuel Oil transfer Station

 Fuel Oil transfer Station

 Fuel Oil transfer Station

 Fuel Oil Piping

 Fuel Oil Piping 

  Fuel Oil Piping

 Coal Conveyor

 Coal Conveyor

 Coal Crusher

 Coal Crusher

 Coal Conveyor

 Piperack 16

 Coal & BOP Electrical Building

 Water & BOP Electrical Building

 Aeration Basin

 Aeration Basin

 Aeration Basin Fan station

 Aeration Basin Elec BLD

  Aeration Basin Elec BLD

 Auxilary Steam

 Stacker reclaimer SRA

 I/O station south

 H2 slab

 Ash Pond

 Ash Pond