22.06.2013

 Site view - North east end
STH - Condenser Neck 
STH - 8m lvl
STH - 8m lvl 
Boiler Electrical Building 
 Fabric Filter
 Boiler
 Transformer Compound
 K11 Tank
 FGD Duct Bypass
 Fabric Filter east side
 STH - Lub oil room
STH - Excitation Room 
 MCWPH
MCW - Discharge Channel

21.06.2013

Boiler cavity


STH west end and K11 Condensate Tank

Boiler Electrical Building

Fabric Filter

Demin Plant and Tanks

Demin Plant and Tanks

 Aeration Basin

Cooling Water Pumphouse

Fly Ash Silo

Industrial Waste Water Pit

Absorber/Reactor Structure

SWFGD Ducting

FGD Northwest End

20.06.2013

STH - STG Table 
 STH - STG Table
 STH - Condenser Hotwells
STH - Condenser 
STH - C04 Tube Cleaning Equipment 
STH 0m lvl - ACW pumps 
 STH - CCW pipe
 STH - CCW pipe
 K11 - Condensate Reheat Tank
Transformer Compound 
Boiler North East End 
Absorber/Reactor Tower 
BTFWP No. 1 Foundation 
Coal handling & BOP Electrical Building 
Fly Ash Silo

19.06.2013

LP3 Heater Installation
LP3 Heater Installation
LP3 Heater Installation
LP3 Heater Installation
LP3 Heater Installation
LP3 Heater Installation
LP3 Heater Installation
 LP3 Heater Installation
LP3 Heater Installation

 Boiler North end

Boiler cavity

STH - FWT

STH - Deaerator Tank on Site

MCW Pipeline - Southeast of STH

STH - Condenser

Transformer Compound

BEB - Electrical Cabinets

Fabric Filter - Installation of Supports

Fly Ash Silo

Bottom-ash Silo Foundation

FGD Duct & Absorber / Reactor tower North end

FGD Booster Fans