06.07.2013


MCWPH - North end
 MCWPH - center
 MCWPH - South end
MCWPH - Tower crane 
Aeration basin 
SWFGD GRP phase 6/7 
 SWFGD GRP phase 4
 SWFGD GRP phase 3
 STH
MNG IV site looking west

05.07.2013

IPB 
STH - Generator 
 STH - Condenser Strand-Jack bases
STH - Condenser Strand-Jack 
STH - HP Heater 16m lvl 
STH - HP Heater 8m lvl  
 STH - 8m lvl
STH -  0m lvl
 FGD Byapass
Boiler Cavity 
Boiler Burners 
 STH - Baby turbine pump
 STH - Lub oil room
Boiler - FD fan 
 Raw water excvations
 Compressor Building
 Industrial Waste Pit
ID Fans

04.07.2013

Mr Lusch site visit to MNG IV 
Mr Lusch site visit to MNG IV 
 STH - STG Table

 STH - High bay lights
 STH -5.2m
 CEB - 0m
 CEB - 4m
 CEB - 10m
CEB - Battery Room 
K11 
 STH - Condenser
 Boiler cavity
Boiler - HP piping 
 Boiler - Cable tray
IPB 
Fabric filter 
 STH - Lube oil Room
CEB - Roof 
MCW & GRP phase 3& 4 
MCW - STH northeast corner 
 BOP area
Laydown