01.03.2014

Transfer Tower 13

Crusher House

Conveyor structure for Crusher House

Painting work for conveyor structure

Conveyor structure to Crusher House

Coal Handling Control Building north side

Coal Handling Control Building west side

Coal Handling Control Building internal wall

Coal Handling Control Building wall plastering

Coal Transfer Tower 11

Transfer Tower 11 ground floor

Fire fighting piping inside Transfer Tower 11

Transfer Tower 11 upper floor

Transfer Tower 11 upper floor

Conveyor structure inside Transfer Tower 11

Coal Transfer Tower 12

Conveyor structure connecting the Transfer Towers

Transfer Towers

28.02.2014

 STH 16 m

 STH 16 m

 STH 16 m

 STH 16 m

 STH 8 m

Forced Air Cooled Compressor H11

 STH 0 m

 STH 16 m

 STH MCW outlet

 CEB Control Rm

 CEB Switchroom

 CEB 0m 

 CEB Cable pit

 FF/FGD Elec BLD 3m

 FF/FGD Elec BLD 3m

FF/FGD Elec BLD 0m

 FGD Aeration Basin Elec BLD

  FGD Aeration Basin Pump station

  FGD Aeration Basin 

  FGD Aeration Basin 

 MCWPH west side drumscreen

 MCWPH west side drumscreen

 MCWPH south end

  MCWPH  south end

  MCWPH north end (pumps)

 MCWPH north end (supply)
 Electrocholrination BLD

 Electrocholrination BLD

 Demin Plant

 Demin Plant

 Demin Plant

 Demin Plant Elec BLD

 Compressor Plant

 Compressor Plant Elec BLD

 Firefighting pumphouse

  Firefighting pumphouse

 Raw water pumphouse

Fabric Filter fly ash