08.10.2011

Installation Of P.C Slab -Consortium Office -1st Floor.

Concreting To Pile #C34-1000mm dia. -Boiler.


Concreting To Pile #T204-1000mm dia. -Turbine Hall.

P.C Slabs -1st Floor -Consortium Office.

07.10.2011

MCWS -Backfilling In Progress.

Preparation For MLT -Pile#B93-800mm dia. -Boiler.

Preparation For MLT -Pile #B93-800mm dia. -Boiler.

Concreting To Pile #T225-1000mm dia. -Turbine Hall.

06.10.2011

Sheet Piles -Bunker/Turbine Hall.

Installation Of Support Beams For 1st Floor Slab -Consortium Office.

Installation Of De-Watering Pump -Bunker Area.

De-Watering Pipes/System -West Perimeter Of Bunker Area.

05.10.2011

Well/De-Watering Pipes -Bunker -West Perimeter.

Concreting To Pile #T223-1000mm dia. -Turbine Hall.

Pre-cast Slabs -Consortium Office.

Installation Of Support Beam For 1st Floor Slab -Consortium Office.

04.10.2011

Installation Of De-Watering Pipes -Bunker/Boiler -West Perimeter.

Erection Of Steel Structures -Support Beams -1st Floor Slab -Consortium Office.

PIT-Test -Pile #B82-1000mm dia. -Boiler.

Inspection Of Link Bars -Ground Beams -Bunker.

03.10.2011

Link Bars Fabrication -Ground Beams -Bunker.

Installation Of Well Pipes -De-Watering System -Bunker/Boiler.

Installation Of Steel Structures -Support Beams -1st Floor Slab.

MCWS -Backfilling In Progress.

30.09.2011

Link Bars -Bunker -Ground Beams.

Installation Of De-Watering Pipes Bunker & Boiler -West Perimeter.

Concreting To Pile #T027-1000mm dia. -Turbine Hall.

Sheet Piling To Turbine Hall South Grid Line.

29.09.11


Boiler & Turbine Hall Overview (MCB)

Boiler Foundation Dewatering System Well points in progress (MCB)