Installation Of P.C Slab -Consortium Office -1st Floor.
Concreting To Pile #C34-1000mm dia. -Boiler.
Concreting To Pile #T204-1000mm dia. -Turbine Hall.
P.C Slabs -1st Floor -Consortium Office.
07.10.2011
MCWS -Backfilling In Progress.
Preparation For MLT -Pile#B93-800mm dia. -Boiler.
Preparation For MLT -Pile #B93-800mm dia. -Boiler.
Concreting To Pile #T225-1000mm dia. -Turbine Hall.
06.10.2011
Sheet Piles -Bunker/Turbine Hall.
Installation Of Support Beams For 1st Floor Slab -Consortium Office.
Installation Of De-Watering Pump -Bunker Area.
De-Watering Pipes/System -West Perimeter Of Bunker Area.
05.10.2011
Well/De-Watering Pipes -Bunker -West Perimeter.
Concreting To Pile #T223-1000mm dia. -Turbine Hall.
Pre-cast Slabs -Consortium Office.
Installation Of Support Beam For 1st Floor Slab -Consortium Office.
04.10.2011
Installation Of De-Watering Pipes -Bunker/Boiler -West Perimeter.
Erection Of Steel Structures -Support Beams -1st Floor Slab -Consortium Office.
PIT-Test -Pile #B82-1000mm dia. -Boiler.
Inspection Of Link Bars -Ground Beams -Bunker.
03.10.2011
Link Bars Fabrication -Ground Beams -Bunker.
Installation Of Well Pipes -De-Watering System -Bunker/Boiler.
Installation Of Steel Structures -Support Beams -1st Floor Slab.
MCWS -Backfilling In Progress.
30.09.2011
Link Bars -Bunker -Ground Beams.
Installation Of De-Watering
Pipes Bunker & Boiler
-West Perimeter.
Concreting To Pile #T027-1000mm dia. -Turbine Hall.
Sheet Piling To Turbine Hall South Grid Line.
29.09.11
Boiler & Turbine Hall Overview (MCB)
Boiler Foundation Dewatering System Well points in progress (MCB)