24.01.2014

MCWPH 
 STH -5.2 m Condensate Ex Pumps 
 Condensate Ex Pump Motor
 Vacum Pumps
 Lub oil flushing
 Lub Oil Rm
 LAC Elec FWP 
 MAN Skid
 DCS Control Rm
 DCS Controller Rm
 FGD Absorber
 GRP phase 3
 STH north wall
 Demin plant
Coal handling & BOP Elec Building

23.01.2014

 Absorber
 Fabric Filter south
 Fabric Filter south
 Boiler northeast
 BOP east
 Industrial waste & piperack B
 Fire fighting & Raw water 7 piperack A
 Demin plabt
 MCW & GRP new HV
 MCw north of STH 
 Coal yard
 GRP phase 2C
 Boiler east side fans
 Boiler internal cabling
 Boiler internal cabling
 Boiler piping insulation
 Boiler Tripper floor
Boiler piping insulation 
 STH 
 STH 
 STH 
 Coal yard run off basin south
 Coal transfer tower 13
 Stacker reclamer
 Oil waste seperator
Coal I/O station south

20.01.2014

MNG overview 
 Boiler south west
 Elec FW pump
 Instrument Control Panal
 MCWPH
 MCWPH
MCWPH 
 Electhrochlorination BLD
 MCW pipe
 Fuel oil Forwarding station
 Piperack 12
Boiler east PA & FD fan
 Boiler west FD fan
 Boiler ash removal system
 Boiler Cavity
 Bottom Ash transfer station
 FGD absorber
 FGD Fan station
 Transfer Tower 13
Crusher house 
Fly ash removal from Fabric filter