13.01.2012

Boring To Pile #A43 -800mm dia. -Absorbers Foundation -EconPile.

Crushing Of Hacked Piles -Fabric Filter -East Side.

Bunker/Mill -B11 -Compaction 1st Layer In Progress.

Mill -F -Steel Fixing -2nd Stage Pour In Progress.

Bunker/Mill -B9 -Backfilling 1st Layer In Progress.

Concreting To Pile #A60-1000mm dia. -Absorbers Foundation -SinoHydro.

F7 -Boiler -East Side -Final Inspection Prior Concreting.

Bunker/Mill -B11-Backfilling & Compaction In Progress -2nd Layer.

Mill -G -Steel Fixing -2nd Stage Pour.

Concreting To Pile #A88 -800mm dia. -Absorbers Foundation -EconPile.

12.01.2012

Boring To Pile #A40-800mm dia. -Absorbers Foundation -EconPile.

Fabric Filter -Hacking Of Piles -Grid -7 To Grid-8.

Mill -G -Steel Reinforcement -2nd Stage Pour In Progress.

Turbine Hall -Excavation 2nd Stage In Progress -Down To Level -2.1MLSD (CWP Pipes Line).

Turbine Hall -2nd Stage Excavation -Down To Level -2.1MLSD In Progress. (CWP -Pipe Lines).

Bunker/Mill -B5 -BA/BB -Steel Fixing In Progress.

J-Bolt Frame -Mill -H -Preparation In Progress.
J-Bolt -Frame -Mill -H -Preparation In Progress.

Mill -H -Steel Fixing -2nd Stage Pour.

F7 -Boiler -East Side -Installation Of Formwork In Progress.

Spraying Of Curing Compound -F1 -Type F -Foundation -Boiler -West Side.

F3 -Boiler -East Side -Inspection Of Steel Reinforcement -Bottom Layer.

F3 -Boiler -East Side -InspectionOf Steel Reinforcement -Bottom Layer.

Brickwall Formwork -Mill -H -Preparation For 2nd Stage Pour -Bunker/Mill.

Concreting To Pile #A68-1000mm dia. -Absorbers Foundation -SinoHydro.

Concreting To Pile #A48-800mm dia. -Absorbers Foundation -EconPile.

11.01.2012

Boring To Pile #A42-800mm dia. -Absorbers Foundation -EconPile.

Fabric Filter -Grid -7 -Grid 8 -Excavation In Progress.

F3 -Boiler -East Side -Steel Fixing -Bottom Layer.

F7 -Boiler -East Side -Installation Of Formwork In Progress.

Bunker/Mill -G -Brickwall Formwork In Progress.

Bunker/Mill -B3 -BB -Steel Fixing In Progress.

CEB -Hacking Of Piles In Progress -(7/12).

CEB -Excavation Completed -Pending Dewatering/Hacking Of Piles.

F1 -Type F -Boiler -West Side -Curing In Progress.

Installation Of Vermiculite & Plug -Pile #A37-1000mm dia. -Absorbers Foundation -EconPile.

Concreting To Pile #A37-1000mm dia. -Absorbers Foundation -EconPile.

F3 -Boiler -East Side -Steel Fixing -Bottom Layer In Progress.

Consortium Office -Alstom -Grd.Floor.

Consortium Office Alstom.

Consortium Office -CMC.

Consortium Office -Alstom -1st Floor -Installation Of Vinyl Tiles.

10.01.2012

Concreting To Pile #A65-1000mm dia. -Absorbers Foundation -SinoHydro.

Sheet Piling -Coffer Dam -F5 -Type E -Foundation -Boiler.

F3 -Preparation To Commence With Steel Fixing -Bottom Layer.

F7 -Boiler -East Side -Steel Fixing In Progress -Scheduled For Castin On 14.01.2012.

Bunker/Mill -North Side -B17-B13 -BB -Backfilling & Compaction In Progress.

Bunker/Mill -B17 -North Side -Backfilling In Progress.

Mill -H -Preparation For Re-Bar/J-Bolts & Concreting -2nd Phase.

PIT -F3 -Boiler -East Side.

BOP -Sub-Station -Project Power Supply -Concreting To Base Slab.

Fabric Filter -Final Inspection Prior Concreting.-Grid 1 -Grid 3.

Boring To Pile #A86-1000mm dia. -Absorbers Foundation -EconPile.

BOP -MCWS -Reclaimation Area -Preparation To Commence With Piling Works -Spun Pile.

BOP -Coal Yard Stack & Reclaimer -MLT In Progress.

BOP -Coal Yard -Test Piling -600mm dia. -Spun Pile .

Fabric Filter -Concreting To Pile Caps & Tie Beams -Grid 1 -Grid 3.

Installation Of Steel Cage -Pile #A14-1000mm dia. -Absorbers Foundation -SinoHydro.

Fabric Filter -Concreting To Pile Caps & Tie Beams -Grid 1 -Grid 3.