13.04.2013

Power Block Northeast Side

Boiler Backpass Hanger Rods Support Structure and Boiler Walls

Boiler - Coal Piping

Boiler - LBC Piping

STH - Looking East

STH - ST / Gen Table

STH - Roofing Works

STH - Lube Oil Room Rebar work

Central Electrical Building @ 0m level

  Central Electrical Building @ 4m level

  Central Electrical Building - Trafo Termination Works@ 4m level

  Central Electrical Building - Electrical Equipment @ 10m level

  Central Electrical Building - Cabling Works @ 10m level

Fabric Filter - Looking North

FGD_RGP and MCW Pipes - Looking Southeast

Aeration Basin and CW Discharge Trench - Looking Southeast

Condensate Make up Tank - Looking North

Fly-ash Silo Foundation

FGD Area - Southside


Cooling Water Pumphouse

Land Reclaimation East Side

12.04.2013

Power Block Northeast Side

Boiler Backpass Hanger Rods Support Structure and Boiler Walls

STH - Looking West

 STH - Looking East

Central Electrical Building @ 0m level

Central Electrical Building @ 4m level

Central Electrical Building @ 4m level

Main Transformer Area- Looking East

FGD_GRP and MCW Pipes - Looking Southwest

MCW Saddle at Aeration Basin

Aeration basin

CW Discharge Trench

Booster Fan - Looking Southwest

FGD Area -Looking Northeast

Bottom Ash Silo

Fly Ash Silo

Screening Plant Foundation

11.04.2013

Power Block Northeast Side

Boiler Backpass Hanger Rods Support Structure and Boiler Walls

 STH - Looking West

 STH - Looking East

Central Electrical Building

Central Electrical Building @ 0m level

Central Electrical Building @ 4m level

Main Transformer Area- Looking East

Fabric Filter - Looking Southwest
 
MCW Saddle at Aeration Basin

Aeration basin


Aeration basin

CW Discharge Trench

Bottom Ash Silo

Demin Water Plant and Tanks Foundations

FGD Area Slab - Northside

Fly Ash Silo

Cooling Water Pumphouse

Manjung 4 Project