09.09.2011

Steel Cage Fabrication -Bore Pile -Turbine Hall -Synohydro.

Excavation For Water Pipes -Consortium Office.

Steel Reinforcement -Ground Beams -Consortium Office.

Laying Of BRC -Base Slab -Consortium Office.

Laying Of BRC -Base Slab -Consortium Office.

Laying Of HDPE Pipe -50mm dia. -Water Supply To Consortium Office.

Formwork Fabrication For Ground Beams -Consortium Office.

MCWS -Pipes Area -Backfilling In Progress. -BOP.

Concreting To Pile # B54 -1200mm dia. -Boiler Area.

Project Sign Board.

08.09.2011


MCB Sign Board Installed. Site branding and front of house
activities continue.
Piling Works Turbine Hall

Piling Works Boiler

Piling Works Boiler

07.09.2011

Concreting To Ground Beams -Consortium Office.

Concreting To Ground Beams -Consortium Office.

Concreting To Pile # T104 -1000mm dia. -Turbine Hall.

Steel Cage Preparation -Bore Pile -Turbine Hall -1000mm dia. -Synohydro.

Steel Cage -Bore Pile -Turbine Hall -Synohydro.

Installation Of Treme Pipes -Pile # T104 -1000mm dia.-Turbine Hall.

Final Preparation To Ground Beams Prior Concreting.

Final Preparation To Ground Beams Prior Concreting.

06.09.2011

Concreting To Pile # T106 -1000mm dia -Turbine Hall.
Boring To Pile # B72 -1200mm dia -Boiler Area.
Steel Cage Preparation -Bore Pile -Turbine Hall -Synohydro.
Steel Reinforcement -Ground Beams -Consortium Office.
Steel Reinforcement -Ground Beams -Consortium Office.

05.09.2011

Backfilling -Temporary Bund -MCWS -Area.

Concreting To Pile # T103 -Turbine Hall -1000mm dia.

Steel Cage Preparation -Bore Pile -Turbine Hall -Synohydro.

Steel Cage Preparation -Bore Pile -Turbine Hall -Synohydro.

Steel Reinforcement -Ground Beams -Consortium Office.

Steel Reinforcement -Ground Beams -Consortium Office.