08.09.2012

Morning Photo_Heavy Rain on Site

07.09.2012


 Aerial View_Power Block Area- Looking South
 Aerial View_Power Block Area- Looking North
Aerial View_Power Block Area- Looking Northwest
Aerial View_Chimney and SWFGD_GRP P2 - Looking Southeast 

 Chimney - Looking Northwest
 Chimney - Looking East
 Phase2_SWFGD_GRP-West of Chimney - Looking Northeast
 Phase2_SWFGD_GRP-West of Chimney - Looking East
 Fabric Filter -East Side- Looking Northwest
 ID Fans West Side- Excavation - Looking South
  Boiler and Fabric Filter - Looking South
  Boiler-Cavity Area - Looking South
  Boiler and Steam Turbine Hall-South Side - Looking North
  Boiler-East Side - Looking Northwest
 BOP Area-Spun Piling-East Side of Boiler - Looking North
  Phase 3_MCW Spun Piling- Looking North
Steam Turbine Hall-South Side-Cooling Water Pipe Saddle - Looking East

  Phase 3_ Cooling Water Pipe Saddle Saddle - Looking Southeast
   Steam Turbine Hall-Structural Steel North Side - Looking Southeast
  Steam Turbine Hall-East Side - Looking North
  Steam Turbine Hall-North Side - Looking East
  Central Electrical Building - Looking Northeast
Screening House-Spun Piling Works - Looking West

06.09.2012

 Chimney - Looking Northwest
 Phase2_SWFGD_GRP-West of Chimney - Looking West
 Phase2_SWFGD_GRP-West of Chimney - Looking East
 Fabric Filter -East Side- Looking Northwest
Fabric Filter -East Side- Platforms- Looking South
  Boiler-Cavity Area - Looking South
 Boiler-West Side - Looking Southeast
 Boiler-East Side - Looking Northwest
 Boiler- Mill C, D, E & F Coal Silo Cone  - Looking North
  BOP Area-Spun Piling-East Side of Boiler - Looking Northeast
  Phase 3_MCW Spun Piling- Looking North
 Condensate Make Up Tank - Looking East
Steam Turbine Hall-Structural Steel North Side - Looking Southeast
 Steam Turbine Hall-East Side - Looking North
 Steam Turbine Hall-East Side Column upto Table- Looking West

 Steam Turbine Hall-South Side-Cooling Water Pipe Saddle - Looking East
 Phase 3_ Cooling Water Pipe Saddle Saddle - Looking Southeast
  Central Electrical Building - Looking Northeast
 MCW Pipe -Beneath New HV Line - Looking North
 MCW Pipe Saddle -Bet. New HV Line and Aeration Basin - Looking South
 Phase 4 SWFGD_GRP-Base Preparation - Looking East

05.09.2012

Afternoon Photos - Heavy Rain
 Chimney - Looking Northwest
Chimney Inside Windshell - Looking South
 Phase2_SWFGD_GRP-West of Chimney - Looking North
Phase2_SWFGD_GRP-West of Chimney - Looking West
 Fabric Filter -East Side- Looking Northwe
  Boiler Electrical Building - Looking Northeast
  ID Fans East Side- Excavation - Looking South
 ID Fans West Side- Excavation - Looking South
  Boiler-Cavity Area - Looking South
   Boiler-East Side - Looking Northwest
  Boiler and Fabric Filter - Looking South
  Boiler- Mill D, E & F Coal Silo Cone  - Looking North
  BOP Area-Spun Piling-East Side of Boiler - Looking Northeast
  Main Transformer Area-Spun Piling Works  - Looking East
 Steam Turbine Hall-South Side-Main Cooling Water Pipe Saddle - Looking East
  Phase 3_MCW-Saddle Excavation Works- Looking Southeast
  Condensate Make Up Tank - Looking Southeast
   Steam Turbine Hall-Structural Steel North Side - Looking Southeast
  Steam Turbine Hall-East Side - Looking North
  Steam Turbine Hall-North Side - Looking East
  Central Electrical Building - Looking Southeast
 MCW Saddle -Bet. New HV Line and Aeration Basin - Looking South
  Phase 4 SWFGD_GRP-Base Preparation - Looking Northeast
  Piperack #10 @ 5yr Ash Pond - Looking South
Aeration Basin-Spun Piling Works - Looking East