Chimney -Steel Fixing -Bottom Layer -Base Foundation.
Waste Water Pit -Steel Fixing -Wall.
F9 -Boiler -East Side -Preparation For Lean Concrete.
Final Measurement -Mill-C -Prior Concreting.
Mill-C -Concreting In Progress.
Mill-C -Concreting In Progress.
Mill-C -Concreting In Progress.
Turbine Hall -Raft Foundation -Installation Of Side Formwork.
Turbine Hall -Raft Foundation -Preparation For Steel Fixing -Stumps/Columns.
Turbine Hall -Raft Foundation -Steel Fixing -Stumps/Columns.
F1-Type A/B/C -Boiler -West Side -Formwork Installation In Progress.
Inspection Of Steel Reinforcement -Prior Shuttering -F2-Type A/B/C/E -Boiler -East Side.
F4-Boiler -West Side -Final Inspection To Stump -Prior Concreting.
Mill -C-Concreting In Progress.
Condensate Sump Pit -1st Stage Pour -Pipes Encasement Structure.
Condensate Sump Pit -1st Stage Pour -Pipe Encasement Structure.