22.03.2012

Chimney -Steel Fixing -Bottom Layer -Base Foundation.

Waste Water Pit -Steel Fixing -Wall.

F9 -Boiler -East Side -Preparation For Lean Concrete.

Final Measurement -Mill-C -Prior Concreting.

Mill-C -Concreting In Progress.

Mill-C -Concreting In Progress.

Mill-C -Concreting In Progress.

Turbine Hall -Raft Foundation -Installation Of Side Formwork.

Turbine Hall -Raft Foundation -Preparation For Steel Fixing -Stumps/Columns.

Turbine Hall -Raft Foundation -Steel Fixing -Stumps/Columns.

F1-Type A/B/C -Boiler -West Side -Formwork Installation In Progress.

Inspection Of Steel Reinforcement -Prior Shuttering -F2-Type A/B/C/E -Boiler -East Side.

F4-Boiler -West Side -Final Inspection To Stump -Prior Concreting.

Mill -C-Concreting In Progress.

Condensate Sump Pit -1st Stage Pour -Pipes Encasement Structure.

Condensate Sump Pit -1st Stage Pour -Pipe Encasement Structure.