31.10.2011

Consortium Site Office.

Final Preparation To Pile Cap -B3 -Bunker/Mill -Prior Concreting.

Concreting To Pile Cap B3 -Bunker/Mill -1st Pour Of MJG4.



Concreting -Bunker/Mill -Pile Cap -B3 -1st Pour Of MJG4.

29.10.2011

Installation Of Dewatering Pipes -Boiler-North Perimeter.

Steel Fixing -Bunker/Mill -Pile Cap -B3.

Inspection Of Re-Bar -Bunker/Mill -Pile Cap -B3.