07.06.2013

 STH- STG Table looking west
  STH -ACW pipe 
  STH - LC Condensate 
 STH - Polishing Plant equipment
STH - Condenser 
South of CEB Aux transformers 
Boiler - 1st Electrical Junction box 
CEB 
 
 STH- Lube Oil Room
STH Baby Turbine foundations 
Boiler Electrical Building

06.06.2013

 STH - Condenser
 STH - 0m level ACW pipe
STH - 8m level CCW pipe 
CCW Tank
CEB - Control Room
 CEB - Cable celler
Electrical IPB
 Boiler Electrical Room
FGD Duct 
Fabric Filter
Boiler north end 
Compressor Building 
 Industrial Waste Water
Bottom Ash Silo 
 Fire Fighting pump house
 Demin. Tanks
Service water tanks 
Fly Ash Silo

05.06.2013

Boiler - Ljungstrom Air Heater

Boiler - Pressure Parts
 
STH - 4.5m level LBC piping

STH - 0m level CCW piping

STH - -5.2m level Cable Tray Works

STH - Condenser components @ 0M lvl

STH - SteamTurbine Bearings

STH - LP Casing and Generator

FW Tank - 1st section

Feed-water tank 2nd section onsite

Feed-water tank lifting of 2nd section

Feed-water tank lifting of 2nd section

Feed-water tank lifting of 2nd section

Feed-water tank lifting of 2nd section

Feed-water tank lifting of 2nd section

STH - Lube Oil Room

Bottom Ash Silo

Fly Ash Silo

Fabric Filter

Condensate Make Up Tank - Looking North

Land Reclaimation Works