| STH Level 16.0m |
| STH Level 16.0m |
| STH Level 16.0m |
| STH Level 19.0m |
| STH south view |
| STH Steam blowing piping |
| CEB Control room |
| CEB Lvl 16.0m Relay room |
| Boiler cavity |
| Boiler cavity |
Boiler cavity
|
| Boiler Tripper Floor |
| Coal conveyor BC06 |
| Coal conveyor BC06 |
| Coal conveyor BC06 |
| CO2 tank |
| Fabric filters rooftop |
| FGD |
| FGD duct B side |
| FGD duct B side |
| FGD duct A side |
| Coal handling and BOP electrical building |
| Coal conveyor BC-01 TO BC-06 |
| Transfer tower 13 |
| Transfer tower 13 south view |
| Transfer tower 13 west view |
| Coal crusher house |
| Coal conveyor BC-06 |
| Bottom ash TT and conveyor |
| Piperack 14 |
| Piperack 7 |
| Piperack 9 |
| Piperack 8 & Aux Steam Line |
| Piperack 6 |
| MNG4 south east view |
| MCW pipe north of STH |
| Service water plant |
| Air compressor plant |
| HP Fire fighting pump house |
| LP Fire fighting pump house |
| Coal yard run-off basin |
| Industrial waste water treatment |
| Demin plant |
| FGD Aeration basin |
| FGD Electrical building |
| FGD Aeration basin |
| Ash pond |
| MCWPH steel structure |
| MCWPH |
| MCWPH |
| MCWPH |
| MCW pipe to MCWPH |
| MCW Intake |
| Electrochlorination building ground floor |
| Electrochlorination building first floor |
| Electrochlorination building first floor |
| Client new HV line |