| GE visit - VIP meeting room |
| GE visit - VIP meeting room |
| GE visit - Boiler |
| GE visit - Boiler |
| GE visit - Boiler |
| GE visit- Boiler |
| GE visit- Boiler |
| GE visit- Boiler |
| GE visit- STH |
| GE visit - STH |
| GE visit - CEB Central control room |
| GE visit - CEB Central control room |
| GE visit - STH |
| GE visit - STH |
| GE visit - Boiler west side |
| GE visit - Boiler west side |
| Boiler south view |
| STH and Boiler west view |
| STH and CEB south view |
| STH Level 16.0m |
| STH Level 16.0m |
| STH Level 16.0m |
| STH Level 16.0m |
| STH Lube oil room |
| STH Level 16.0m |
| H2 Gas Bottles shed |
| Condensate Polishing Plant |
| STH south view |
| STH south view |
| ID fan duct west side |
| CEB south view |
| Client HV Switchyard |
| Client HV Switchyard |
| Client coal yard |
| GRP Phase 5 |
| GRP Phase 5 |
| Piperack 15.2 |
| Piperack 15.2 |
| Coal transfer towers |
| Coal transfer tower 13 and Conveyor BC-07 |
| Bottom ash conveyor |
| CO2 tank shed |
| Coal handling and BOP electrical building |
| Stacker reclaimer A |
| Stacker reclaimer B |
| Aeration basin |
| Aeration basin |
| Fly ash silo |
| Coal yard I/O station |
| Fuel oil forwarding station |
| Coal run-off basin |
| Coal handling electric room |
| Coal handling control building |
| Warehouse building |
| Demin plant |
| MCWPH and Electrochlorination plant |
| Cooling water discharge channel |
| Plant road preparation |