GE visit - VIP meeting room |
GE visit - VIP meeting room |
GE visit - Boiler |
GE visit - Boiler |
GE visit - Boiler |
GE visit- Boiler |
GE visit- Boiler |
GE visit- Boiler |
GE visit- STH |
GE visit - STH |
GE visit - CEB Central control room |
GE visit - CEB Central control room |
GE visit - STH |
GE visit - STH |
GE visit - Boiler west side |
GE visit - Boiler west side |
Boiler south view |
STH and Boiler west view |
STH and CEB south view |
STH Level 16.0m |
STH Level 16.0m |
STH Level 16.0m |
STH Level 16.0m |
STH Lube oil room |
STH Level 16.0m |
H2 Gas Bottles shed |
Condensate Polishing Plant |
STH south view |
STH south view |
ID fan duct west side |
CEB south view |
Client HV Switchyard |
Client HV Switchyard |
Client coal yard |
GRP Phase 5 |
GRP Phase 5 |
Piperack 15.2 |
Piperack 15.2 |
Coal transfer towers |
Coal transfer tower 13 and Conveyor BC-07 |
Bottom ash conveyor |
CO2 tank shed |
Coal handling and BOP electrical building |
Stacker reclaimer A |
Stacker reclaimer B |
Aeration basin |
Aeration basin |
Fly ash silo |
Coal yard I/O station |
Fuel oil forwarding station |
Coal run-off basin |
Coal handling electric room |
Coal handling control building |
Warehouse building |
Demin plant |
MCWPH and Electrochlorination plant |
Cooling water discharge channel |
Plant road preparation |