10.07.2014

 500ton crane for Coal back-up supply to bunker

 MCW outlet pipe north on STH
 Boiler slag conveyor

 GRP phase 3

  GRP phase 5

 Aeration Basin

Aeration Basin 

 Aeration Basin

 MCWPH Elec Rm

 MCWPH 

 MCWPH 

 MCW intake precast channels

Electrchrlorination BLDG

 Electrchrlorination BLDG

 Electrchrlorination BLDG

 MCW supply

 Demin plant

Temporary Demin plant

 CMC FG Ducting

 Cola conveyor BC6

 Industrial Waste plant

 Industrial Waste plant Elec BLDG

 Treated waste water reclaimed plant

 Fly ash Elec BLDG

 Road way drainage

5 year Ash pond

07.07.2014

 CEB Control RM

  CEB Control RM

 BOP - ID Fan A in operation

 ST on turning gear

DCS - ALSPA checks

 STH - 16m lvl

  STH - 16m lvl

  STH - 0m lvl

   STH - 0m lvl

   STH - Roof lvl

 Boiler CO2

 Boiler N2

 F10 Bottom ash

 Boiler - Tripper floor

 GRP lines

 BOP & Coal Control Bldg

Stacker reclaimer A