16.03.2013

Power Block Southeast Side

Boiler - Pressure Parts and Walls

Boiler - Coal Piping Erection

Boiler Backpass Hanger Rods Support Structure

Boiler - Horizontal cable Tray Erection (West side)

Boiler - LBC piping (West side)

Boiler - Area 2
 
STH - ST/GT Table (North side)

CEB - Cable Pulling Works in progress - 0m level

CEB - 4m level
CEB - 10m level

 Main Transformer Area - Looking east
CEB - 25m level




Fabric Filter Plant Casings East Side

Fabric Filter Plant & BEB
 
Fabric Filter Plant

 FGD_GRP and MCW pipe looking southeast

 Aeration basin and Coooling water discharge trench


Service/Fire/Potable tank foundation - looking east

Demin Water Plant Foundation

FGD Area South side
FGD Bypass Area


FGD Electrical Building Foundation

Fly-ash Silo Foundation

Land Reclaimation

15.03.2013

FGD, Fabric Filter and Power Block

Boiler - East Side

Boiler - Pressure Parts and Walls

Boiler Backpass Hanger Rods Support Structure

CEB - Northwest side

 Main Transformer Area - Looking east

Fabric Filter Plant Southeast Side

MCW Pipeline South of Turbine Hall

MCW Pipeline from South of Turbine Hall
 
Laying of GRP Pieline South of HV Line

MCW and MCW Saddle south of HV Line

MCW Saddle at Aeration Basin

Condensate Tank

Screening Plant Foundation

Fly-ash Silo Foundation

FGD Area - North Side

14.03.2013

FGD, Fabric Filter and Power Block

Boiler - Pressure Parts and Walls

Boiler Backpass Hanger Rods Support Structure

CEB - Cable Pulling Works in progress - 0m level

CEB - 4m level

CEB - 16m level

CEB - Northwest side

 Main Transformer Area - Looking east


Fabric Filter Plant Southeast Side

MCW Pipeline South of Turbine Hall

MCW and MCW Saddle south of HV Line

MCW and GRP Pielines South of HV Line

Aeration basin

CW Discharge Trench

Condensate Make Tank

FGD - Duct Erection

Service/Fire/Potable tank foundation - looking east

Screening Plant Foundation