| Power Block Southeast Side |
| Boiler - Pressure Parts and Walls |
| Boiler - Coal Piping Erection |
| Boiler Backpass Hanger Rods Support Structure |
| Boiler - Horizontal cable Tray Erection (West side) |
| Boiler - LBC piping (West side) |
| Boiler - Area 2 |
| STH - ST/GT Table (North side) |
| CEB - Cable Pulling Works in progress - 0m level |
| CEB - 4m level |
| CEB - 10m level |
| Main Transformer Area - Looking east |
| CEB - 25m level |
| Fabric Filter Plant Casings East Side |
| Fabric Filter Plant & BEB |
| Fabric Filter Plant |
| FGD_GRP and MCW pipe looking southeast |
| Aeration basin and Coooling water discharge trench |
| Service/Fire/Potable tank foundation - looking east |
| Demin Water Plant Foundation |
| FGD Area South side |
| FGD Bypass Area |
| FGD Electrical Building Foundation |
| Fly-ash Silo Foundation |
| Land Reclaimation |