22.08.2014

 MCWPH

  MCWPH

  MCWPH

  MCWPH

 MCW supply pipe north of MCWPH

 STH hall 16 m lvl

  STH hall 16 m lvl

  STH hall 16 m lvl

  STH hall 16 m lvl

  STH hall 16 m lvl

  STH hall 16 m lvl

  STH hall 16 m lvl

  STH hall 16 m lvl

  STH hall 8m lvl

  STH hall 8 m lvl

 STH hall 8 m lvl

 STH hall 8 m lvl

 STH hall 8 m lvl

 STH hall 0 m lvl

 STH hall -5.2 m lvl

STH external facade

 F10 Bottom ash

 F10 Bottom ash

 STH Roof lvl

 N2 storage

 Boiler SSC

  Boiler SSC

 Boiler Cavity

 Boiler PA fan westside

 FGD Booster fans

 FGD north end ducting and Absorber

 GRP phase 2

 BOP southeast end

 CMC Demin plant 

 CMC Demin plant 

  CMC Demin plant 

  CMC Demin plant 

  CMC Compressor plant 

 CMC Compressor plant 

 CMC Compressor plant 

 CMC Fire Fighting plant 

 CMC BOP piping

 Stacker reclamer

 Coal yard area B

 Road way drainage

 CMC store building

CMC ash removal

 CMC ash removal

                                                             CMC ash removal

20.08.2014


MNG4 south view
MNG4 south view
Boiler south view
STH and CEB south view
CEB south view
Client coal yard
Client HV Switchyard
Client HV Switchyard
Aeration basin
Aeration basin
Aeration basin
Piperack 15.2
Piperack 15.2
Transfer towers
Transfer tower TT13 and conveyor BC-07
Coal yard P1
Stacker reclaimer A
Coal handling control building
Stacker reclaimer B
Coal run-off basin
Fuel oil forwarding station
Demin plant
MCWPH
Electrochlorination plant
FGD Aeration basin
MCWPH bar screen
MCWPH
MCW Intake
MCW Intake
MCW pipes backfilling