21.12.2013

MNG4 south side view


MNG4 south side view


CEB south side view


CEB and STH south side view


Client Coal yard


Client HV Switchyard


Transfer Towers

Stacker Reclaimer 2 foundation


Coal Conveyor BC1


Coal Conveyor BC1


Coal Conveyor BC1

Coal Conveyor BC1

Coal Conveyor BC1

Coal Conveyor BC1 main entrance view

Aeration basin

Aeration basin

Aeration basin

CWPH

20.12.2013

 Absorber north
Fabric Filter South
 FD Fan east
 PA Fan east
 Boiler Feeder Floor
PAB MCW outlet
 Demin Plant & PRA
 Raw & Fire water
 Industrial Waste Basin
 Coal Handling & BOP Elec BLD
 U/G Oil Separator
Crusher/Screening BLD

18.12.2013

 Boiler west
 Boiler west PA fan
  Boiler east PA & FD fan
 Boiler north end
 Boiler north end
 Absorber north end
 Fabric Filter 0m lvl
 Piperack 3
 BOP & Coal Handling Elec BLD
 Gas storage
Demin Plant

16.12.2013

 MNG 4
 MNG 4 powerblock east side
 Boiler northwest end
 STH southend
 MCWPH south east end
 MCWPH north end
 500KV meter Back feed achieved
 GCB Back feed achieved
 Elec FWP Motor
 Fuel oil Transfer station
 Fuel Oil Connection to MNG123
 STH 8m lvl
 STH 8m lvl
STH 16m lvl 
STH 8m lvl 
 Boiler east-side FD/PA fan
 Demin Plant
 Demin Plant
 Firfighting & Raw water plant
Fabric Filter Elec BLD 
 Fabric Filter Elec BLD 0m lvl
 MCW run from STH
 Stacker Reclaimer B
 Coal Yard transfer Tower 13
 Coal Handling Control BLD
Aeration Basin Fan Station