| Boiler - Looking Northwest |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Boiler-Steel Structure for Main Steam Piping Supports |
| Boiler-Cable tray works at 8m lvl |
| Boiler-Coal Piping Installation |
| Boiler-Pressure Parts Pipe Headers (West Side) |
| Boiler-Pressure Parts Pipe Headers (East Side) |
| Boiler-LBC Piping Installation (West Side) |
| Boiler - 100m Level |
| Steam Turbine Hall (West Side) |
| Steam Turbine Hall-ST / GT Table |
| CEB - Cable Trays Earthing - 0m level |
| MV Switchgear CEB - 4m level |
| 4 nos. of MV/LV Transformer CEB - 4m level |
| CEB - 10m level |
| Main Transformer Area- Electrical duct works |
| Main Transformer Area- Delivery of 3rd GSUT |
| Boiler Electrical Building |
| Fabric Filter South Side |
| SWFGD GRP MCW Piping and Saddle Installation |
| MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
| CW Pump house |
| Service/Fire water storage tanks fdn works |
| Demin Water Treatment Plant Fdn Works |
| Fly Ash Silo Fdn |
| Condensate Make-up Tank |
| FGD Area - Looking North |
| Land reclaimation works |