28.10.2011

Load Test In Progress -Pile #B82-1000mm dia. -Boiler -966.5Ton.

Inspection Of Steel Reinforcement -Bunker/Mill -Pile Cap -B1

Installation Of Steel Reinforcement -Bunker/Mill Pile Cap -B3.

Brick Laying -Consortium Office.

27.10.2011

Consortium Office.

Weekly Safety Tool Box Meeting.

Concreting To 1st Floor Slab -Consortium Office.

Consortium Site Office -Laying Of BRC -1st Floor Slab -Last Section.

25.10.2011

Air View Of MJG4.

Consortium Office.

Installation Of Dewatering Pipes -Boiler -North Perimeter.

Excavation To Boiler Area.

Hacking Of Piles -Bunker/Mill -B7.

24.10.2011

Consortium Office -Installation Of P.C Slabs And Purlins In Progress.

Excavation To Boiler Area.

Steel Reinforcement -Bunker/Mill -Pile Cap.

Steel Reinforcement For Bunker/Mill -Pile Cap -Foundation.

Hacking Of Piles -Bunker/Mill -Pile #A77/A23/A24/A26/A25 -800mm dia.

22.10.2011

Excavation To Boiler Area.

Steel Reinforcement Preparation -Bunker/Mill -Pile Cap.

PIT -Test -Bunker/Mill -Pile#A75/A05/A06/A07/A08 -800mm dia.

Concreting To 1st Floor Slab -Consortium Office.

Laying Of BRC -1st Floor -Consortium Office.

SI Pontoon -Ash Pond -BOP.

Backfilling -MCWS.