28.10.2011
Load Test In Progress -Pile #B82-1000mm dia. -Boiler -966.5Ton.
Inspection Of Steel Reinforcement -Bunker/Mill -Pile Cap -B1
Installation Of Steel Reinforcement -Bunker/Mill Pile Cap -B3.
Brick Laying -Consortium Office.
27.10.2011
Consortium Office.
Weekly Safety Tool Box Meeting.
Concreting To 1st Floor Slab -Consortium Office.
Consortium Site Office -Laying Of BRC -1st Floor Slab -Last Section.
25.10.2011
Air View Of MJG4.
Consortium Office.
Installation Of Dewatering Pipes -Boiler -North Perimeter.
Excavation To Boiler Area.
Hacking Of Piles -Bunker/Mill -B7.
24.10.2011
Consortium Office -Installation Of P.C Slabs And Purlins In Progress.
Excavation To Boiler Area.
Steel Reinforcement -Bunker/Mill -Pile Cap.
Steel Reinforcement For Bunker/Mill -Pile Cap -Foundation.
Hacking Of Piles -Bunker/Mill -Pile #A77/A23/A24/A26/A25 -800mm dia.
22.10.2011
Excavation To Boiler Area.
Steel Reinforcement Preparation -Bunker/Mill -Pile Cap.
PIT -Test -Bunker/Mill -Pile#A75/A05/A06/A07/A08 -800mm dia.
Concreting To 1st Floor Slab -Consortium Office.
Laying Of BRC -1st Floor -Consortium Office.
SI Pontoon -Ash Pond -BOP.
Backfilling -MCWS.