29.01.2014

 Boiler West Side PA fan
 Boiler Steam piping
 Boiler Steam piping
 Boiler Cable trays
 Boiler Cable trays
 Boiler Cabling
Boiler tripper floor
 Fabric Filter southend
 Turbine hall FWT
 BOP - Raw & Fire water
 BOP - Demin
 MCW south east of STH
 MCW south east of STH
 Industrial waste water Pit
 BOP RO rejection tank
 Coal yard South drainage run off
Coal yard TT13

28.01.2014

MNG4 south view

MNG4 south view

STH and CEB south view

CEB south view

Client Coal Yard

Client HV Switchyard

GRP Phase 6

Aeration Basin

Aeration Basin

Transfer Towers

Stacker Reclaimer A

Stacker Reclaimer B

TTS12 and TTS13

Conveyor Belt BC1

Conveyor Belt BC1

Coal Handling Control Building

Fuel Oil Forwarding Station

Demin Plant

27.01.2014

 MNG Overview
Absorber/Reactor 
 Fabric Filter
 Boiler cavity
 Boiler Cavity
 FD fan West side
 Aeration Basin
Absorber pump station 
 Absorber Fan station
 ECS GRP phase 4 
 ECS GRP phase 3 
 GRP phase 36
 MCWPH southeast
 MCWPH southwest
 MCWPH west bay
 MCW 
 Electrchlorination
 Fuel Oil Pump house
 Piperack 9.3
 Stacker reclamer A
Stacker reclamer B 
 Piperack A/B
Compressor BLD Elec Rm