22.03.2012

Chimney -Steel Fixing -Bottom Layer -Base Foundation.

Waste Water Pit -Steel Fixing -Wall.

F9 -Boiler -East Side -Preparation For Lean Concrete.

Final Measurement -Mill-C -Prior Concreting.

Mill-C -Concreting In Progress.

Mill-C -Concreting In Progress.

Mill-C -Concreting In Progress.

Turbine Hall -Raft Foundation -Installation Of Side Formwork.

Turbine Hall -Raft Foundation -Preparation For Steel Fixing -Stumps/Columns.

Turbine Hall -Raft Foundation -Steel Fixing -Stumps/Columns.

F1-Type A/B/C -Boiler -West Side -Formwork Installation In Progress.

Inspection Of Steel Reinforcement -Prior Shuttering -F2-Type A/B/C/E -Boiler -East Side.

F4-Boiler -West Side -Final Inspection To Stump -Prior Concreting.

Mill -C-Concreting In Progress.

Condensate Sump Pit -1st Stage Pour -Pipes Encasement Structure.

Condensate Sump Pit -1st Stage Pour -Pipe Encasement Structure.

21.03.2012

Chimney -Hacking Of Piles -Preparation For PIT & Steel Fixing -Foundation.

Fabric Filter -Formwork Installation -Stumps.

F1-Type A/B/C -Boiler -West Side -Formwork Installation.

F2-Type F -Type C -Boiler -East Side -Steel Fixing -Beam.

F11-B10/B12 -Preparation For Lean Concrete.

F10-B8/B6 -Excavation In Progress.

Mill-B -Installation Of J-Bolts.

F9 -Boiler -East Side -Excavation In Progress.

Erection Of Site Office -EverShendai.

Chimney -Steel Fixing -Bottom Layer -Base Foundation.

Chimney -Steel Fixing -Bottom Layer -Base Slab In Progress.

F11-B12/B10 -Boiler -East Side -Lean Concreting In Progress.

Mill-C -Final Preparation Prior Concreting.

F10-B8/B6 -Boiler -West Side -Preparation For Lean Concrete.

20.03.2012

Chimney -Pile Hacking In Progress.

Chimney -Bar Bending Yard For Foundation & Base Slab.

Fabric Filter -Formwork Installation -Stumps.

Waste Water Pit -Base Slab -Curing In Progress.

F10-B10/B12 -Boiler -West Side -Excavation In Progress.

Mill-C -Steel Fixing -Cantilever -Slab.

Mill-B -Installation Of J-Bolts.

Turbine Hall -Steel Reinforcement -Top Layer -Raft Foundation.

Turbine Hall -Steel Reinforcement -Raft Foundation -Top Layer.

FGD -Pipes -1st Phase -Area-1 -Sheet Piles -Preparation For Excavation & Pile Cutting.

Condensate Sump Pit -Preparation For 1st Stage Pour -Pipe Casing.

Turbine Hall -Inspection -Steel Reinforcement -Raft Foundation -Top Layer.

19.03.2012

Chimney -Hacking Of Piles In Progress.

Bar Bending Yard -Chimney.

Formwork Preparation -Chimney -Foundation.

Fabric Filter -Installation Of Formwork -Stumps.

F1-Type A/B/C -Boiler -West Side -Steel Fixing -Pile Cap / Beams.

Waste Water Pit Base Slab -Curing In Progress.

Mill-C -Steel Fixing -Cantilever Slab.

F5-Boiler -PIT In Progress Prior Steel Fixing.

Turbine Hall -Steel Reinforcement -Raft Foundation -Top Layer.

Turbine Hall -Steel Fixing -Raft Foundation.

Fabric Filter -Backfilling & Compaction -Grid 5 -Grid 8.

F4-Boiler -West Side -Inspection Of Steel Reinforcement Prior Shuttering.

Mill-C -Installation Of I-Beams & J-Bolts Frame.

Erection Of Site Office -EverShendai.