Chimney -Hacking Of Piles.
Chimney -Steel Cutting & Bending -Foundation.
F5 -Type B & C -Boiler -Hacking Of Piles.
F4-Boiler -West Side -Steel Reinforcement -Type A.
Mill-D -Steel Fixing -Cantilever Slab.
PIT -Turbine Hall.
Condensate Sump Pit -Steel Cage.
Turbine Hall -Steel Reinforcement -Raft Foundation.
Mill-Pedestal -B3-BA -Applying Of Curing Compound.
Tower Crane Foundation -Final Preparation Prior Concreting-Base Slab.
F4-Boiler -East Side -Excavation In Progress.
Mill -D -Steel Fixing -Cantilever Slab.
Condensate Sump Pit -Installation Of Casing.
F4-Stump -Boiler -West Side -Inspection Of Steel Reinforcement Prior Shuttering.
Waste Water Pit -Final Preparation Prior Concreting -Base Slab.