| Boiler, FGD Ducts, Booster Fans and FF - Looking South |
| Boiler - Looking Southwest |
| Boiler Duct Work - East Side |
| Boiler - Looking Southeast |
| Boiler - Cable Riser West Side |
| Boiler - Cooling Water Pipe Trench between Boiler & STH |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Boiler Area 2 Slab Concreting Works |
| Boiler Area - Passenger Hoist Erection |
| Steam Turbine Hall - Looking West |
| Steam Turbine Hall - Looking North |
| Steam Turbine Hall - Looking East |
| Central Electrical Building - West Side |
| 4 nos. of MV/LV Transformer CEB -4M level |
| Central Electrical Building - 4M Level Cable Tray Installation |
| Central Electrical Building Floor Screeding - 10M |
| Central Electrical Building - 10M |
| Central Electrical Building - 16M Level |
| Main Transformer Area- Looking East |
| Boiler Electrical Building - Looking South |
| Fabric Filter - Looking Northeast |
| Cooling Water Pipe Saddle East Side of STH |
| SWFGD GRP Phase 3 and MCW Saddle |
| SWFGD GRP and MCW North of New HV Line |
| Reclaimed Existing 5 yr Ash pond |
| Demin Water Tank Fdn Works |
| Demin Water Treatment Plant Fdn Works |
| Service/Fire water storage tanks fdn works |
| Fly Ash Silo Fdn |
| FGD Area - Looking South |
| Screening House - Looking Southwest |
| Boiler LBC Piping Installation Preparation |