| Boiler, FGD Ducts, Booster Fans and FF - Looking South |
| Boiler - Looking Southwest |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Boiler-Pressure Parts Wall |
| Boiler Area 2 Slab Concreting |
| Boiler - 100m Level |
| Boiler - Piping installation |
| Boiler - Cable Riser West Side |
| Boiler LBC Piping Installation Preparation |
| Steam Turbine Hall - Looking West |
| Steam Turbine Hall-ST / GT Table - Looking East |
| Steam Turbine Hall-ST / GT Table - Looking East |
| Steam Turbine Hall-ST / GT Table - Looking West |
| Central Electrical Building - West Side |
| Central Electrical Building - 4m Level |
| 4 nos. of MV/LV Transformer CEB -4M level |
| Central Electrical Building cable tray installation- 4m Level |
| Central Electrical Building - 10M level |
| Main Transformer Area- Looking East |
| Fabric Filter - Looking North |
| Fabric Filter - Looking Northeast |
| Cooling Water Pipe Saddle East Side of STH |
| SWFGD GRP Phase 3 and MCW Saddle |
| Existing 5 yr Ash pond |
| Service/Fire water storage tanks fdn works |
| Demin Water Tank Fdn Works |
| Demin Water Treatment Plant Fdn Works |
| Fly Ash Silo Fdn |
| Booster Fan, Absorbers and FGD Foundation - Looking South |
| Booster Fan, Absorbers and FGD Foundation - Looking North |
| FGD Electrical Building & Pipe Rack 4 Fdns |
| Screening House - Looking Southwest |
| Arrival of 2 nos. GSUT at Site |
| 2 nos. GSUT |
| Land Reclaimation Works |