| Boiler, FGD Ducts, Booster Fans and FF - Looking Southeast |
| Boiler - Looking Southwest |
| Boiler - Looking Southeast |
| Boiler-Pressure Parts Lifting Works |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Boiler - Piping Installation Works |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Boiler Area 2 Slab Concreting Works |
| Steam Turbine Hall - Looking West |
| Steam Turbine Hall - Looking East |
| Steam Turbine Hall-ST / GT Table - Looking East (south side) |
| Steam Turbine Hall-ST / GT Table - Looking East (north side) |
| Steam Turbine Hall-ST / GT Table - Looking South |
| Boiler Electrical Building - Looking South |
| Fabric Filter - Looking Northeast |
| Fabric Filter - Looking East |
| Central Electrical Building - 4M Level |
| Central Electrical Building - 4M Level Cable Tray Installation |
| SWFGD GRP Phase 3 and MCW Saddle |
| SWFGD GRP and MCW North of New HV Line |
| Reclaimed Existing 5 yr Ash pond |
| Service/Fire water storage tanks fdn works |
| Demin Water Tank Fdn Works |
| Demin Water Treatment Plant Fdn Works |
| Fly Ash Silo Fdn |
| FGD Area - Looking South |
| FGD Area - Looking North |